Planning application
10 Birley Moor Place Sheffield S12 3AW
Works: Extension Roofing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single-storey rear extension - the extension will be 5 metres from the rear of the original dwellinghouse, ridge height no more than 2.9 metres and height to the eaves of 2.7 metres
As published by the council, reference 21/03990/HPN
Application record
- Reference
- 21/03990/HPN
- Type
- Householder Prior Notification
- Status
- Decided
- Decision
- Granted As published: Prior Approval not Required
- Received
- 7 Sep 2021
- Validated
- 7 Sep 2021
- Decided
- 7 Oct 2021
- Ward
- Birley
- Decision by
- Delegated decision
- Postcode
- S12 3AW
Site history
Applications at this address on the Sheffield register
This site has had 2 applications since 2021: 1 approved, 0 refused.
-
21/03400/FUL Withdrawn
10 Birley Moor Place Sheffield S12 3AW
Erection of single-storey rear extension to dwellinghouse
Timeline
Dates from the published record
-
7 Sep 2021
Received by Sheffield
-
7 Oct 2021
Decision issued: Prior Approval not Required
-
20 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Sheffield granted permission on 7 October 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
10 Birley Moor Place Sheffield S12 3AW
Erection of single-storey rear extension to dwellinghouse
Withdrawn Full applications Extension 9 docsSmall domestic -
23 Birley Moor Way Sheffield S12 3AX
Erection of two-storey side/rear extension to form ancillary annexe to dwellinghouse
Refused Full applications Extension 19 docsDomestic -
10 Birley Moor Drive Sheffield S12 3AU
Erection of two/single-storey rear extension to dwellinghouse
Granted Full applications Extension 6 docsSmall domestic -
7 Birley Moor Drive Sheffield S12 3AT
Use of dwellinghouse (Use Class C3) as a childrens residential home (Use Class C2) to accommodate a maximum of two children, and the erection of bin store and cycle shelter
Granted Full applications 14 docsDomestic -
14 Birley Moor Avenue Sheffield S12 3AQ
Erection of single-storey front porch to dwellinghouse
Granted Full applications Extension 5 docsSmall domestic -
Meadowcroft 1 Birley Lane Sheffield S12 3BP
Pruning and removal of trees (Moss Valley Conservation Area)
Granted Trees 4 docs
Other prior approval applications
In Sheffield
-
26/01831/PVPN Granted
Mayflower Works Darnall Road Sheffield S9 5AB
Installation of roof mounted solar panels
-
26/01610/PVPN Granted
Charnock Hall Primary School Carter Hall Road Sheffield S12 3HS
Installation of roof mounted solar panels
-
26/01548/HPN Refused
257 Shirecliffe Road Sheffield S5 8XE
Single-storey rear extension to dwellinghouse - the extension is 8 metres from the rear of the original dwellinghouse, ridge height no more than 4 metres and the height of the eaves is 3 metres
-
26/01520/HPN Granted
44 Thorpe Drive Sheffield S20 7JU
Single-storey rear extension to dwellinghouse - the extension is 4.0 metres from the rear of the original dwellinghouse, ridge height no more than 3.31 metres and the height of the eaves is 2.52 metres
-
26/00980/PVPN Granted
Sherwin-Williams Diversified Brands Limited Thorncliffe Road Sheffield S35 2YP
Installation of 1285 KWP PV solar system