Skip to content
PlanIndex Get alerts
Menu

Planning application

154 Knowle Lane Sheffield S11 9SJ

Granted Sheffield 21/03757/FUL Full Planning Application

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of single-storey rear extension and erection of single-storey rear extension to dwellinghouse in matching render

As published by the council, reference 21/03757/FUL

Application record

Reference
21/03757/FUL
Type
Full Planning Application
Status
Decided
Decision
Grant Conditionally
Received
19 Aug 2021
Validated
19 Aug 2021
Decided
23 Sep 2021
Ward
Ecclesall
Decision by
Delegated decision
Postcode
S11 9SJ

Timeline

Dates from the published record

  1. 19 Aug 2021

    Received by Sheffield

  2. 23 Sep 2021

    Decision issued: Grant Conditionally

  3. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • A1 Sound 274 Ringinglow Road Sheffield S11 7PX

    19/02376/COND1 Submitted 30 Sep 2019 116m away

    Application to approve details in relation to condition numbers 3. Amplified Sound and 4. Sound Attenuation Works; Relating to planning permission 19/02376/CHU

    Decided Conditions 7 docs
  • 106 Knowle Lane Sheffield S11 9SJ

    26/02296/FUL Submitted 31 Jul 2026 116m away

    92% historically approved · decision due ~30 Sep

    Hip to gable roof extension to form second-floor habitable space with 2no front and 1no rear gable windows, 1no rear dormer window and new roof finish; erection of single-storey rear extension with extended rear stepped terrace, exterior cladding and rendering with associated hard and soft landscaping works to the driveway and rear garden of dwellinghouse

    Awaiting decision Full applications Extension Loft or dormer +2
    Small domestic
  • 205 Ringinglow Road Sheffield S11 7PT

    26/01808/FUL Submitted 16 Jun 2026 119m away

    92% historically approved · decision due ~11 Aug

    Demolition of existing rear conservatory and partial demolition of an existing single storey rear off shot and erection of a single-storey rear flat roof extension with stepped access, raised terrace with guarding and new boundary fence

    Awaiting decision Full applications Extension Demolition
    Small domestic
  • 75 Marsh House Road Sheffield S11 9SQ

    23/02927/FUL Submitted 18 Sep 2023 157m away

    Erection of a single-storey rear extension and a side extension over the existing garage

    Granted Full applications Extension 12 docs
    Small domestic
  • 69 Marsh House Road Sheffield S11 9SQ

    26/02077/FUL Submitted 10 Jul 2026 189m away

    92% historically approved · decision due ~4 Sep

    Erection of two-storey side extension, single-storey rear extension, porch to front and alterations to roof including erection of dormer extension with Juliet balconies to rear of dwellinghouse (Application under Section 73 to vary condition 2 (Approved Plans) imposed by planning permission 26/00908/FUL)

    Awaiting decision Full applications Extension Loft or dormer
    Small domestic
  • 120 Bents Road Bents Green Sheffield S11 9RL

    26/02485/FUL Submitted 18 Aug 2026 215m away

    92% historically approved · decision due ~13 Oct

    Demolition of existing detached garage and erection of new single storey outbuilding for store/workshop

    Awaiting decision Full applications Demolition
    Small domestic

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications