Planning application
14 Rutland Park Sheffield S10 2PB
Works: Windows or glazing Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alterations to cellar to form additional habitable accommodation including formation of 2no. light wells to front, replacement of all windows with like for like timber sash windows, and addition of 2no. windows to front roof elevation of dwellinghouse
As published by the council, reference 21/02990/FUL
Application record
- Reference
- 21/02990/FUL
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 1 Jul 2021
- Validated
- 1 Jul 2021
- Decided
- 30 Sep 2021
- Ward
- Broomhill And Sharrow Vale
- Decision by
- Delegated decision
- Postcode
- S10 2PB
Timeline
Dates from the published record
-
1 Jul 2021
Received by Sheffield
-
30 Sep 2021
Decision issued: Grant Conditionally
-
20 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
20 Rutland Park Sheffield S10 2PB
92% historically approved · decision due ~21 Sep
Replacement of timber framed windows with timber framed double glazed windows
Awaiting decision Full applications Windows or glazing 8 docs -
22 Rutland Park Sheffield S10 2PB
Alterations to roof including addition of 3no. rooflights to front, repairs/replacement of roof and repair to chimney stack and like for like replacement of windows and door to front of dwellinghouse
Granted Full applications Loft or dormer Windows or glazing 5 docsDomestic -
-
-
Sheffield High School For Girls 10 Rutland Park Sheffield S10 2PB
Pruning and Removal of Trees (Broomhill Conservation Area)
Granted Trees 5 docs -
Sheffield High School For Girls 10 Rutland Park And Land Adjacent To 1 Melbourne Avenue Sheffield S10 2PB
Removal of trees (Broomhill Conservation Area)
Granted Trees 4 docs
Other full applications applications
In Sheffield
-
26/02602/FUL Awaiting decision
155 Derbyshire Lane Sheffield S8 8SA
Widening of the existing driveway crossover
-
26/02604/FUL Awaiting decision
St Johns Church Bernard Street Sheffield S2 5PU
Replacement windows
-
26/02589/FUL Awaiting decision
The Anvil 109 Clough Road Sheffield S2 4TB
Installation of CAT Ladders on east, south and west elevation of building and associated works
-
26/02587/FUL Awaiting decision
28 Vernon Road Sheffield S17 3QE
Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse
-
26/02579/FUL Awaiting decision
28 Grove Road Millhouses Sheffield S7 2GZ
Erection of single-storey rear extension to dwellinghouse