Skip to content
PlanIndex Get alerts
Menu

Planning application

100 Fulton Road Sheffield S6 3JN

Refused Sheffield 21/02256/FUL Full Planning Application

Works: Loft or dormer Domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Alterations to roof to form additional habitable accommodation including erection of front and rear dormers to dwellinghouse

As published by the council, reference 21/02256/FUL

Application record

Reference
21/02256/FUL
Type
Full Planning Application
Status
Decided
Decision
Refuse
Received
14 May 2021
Validated
24 May 2021
Decided
10 Sep 2021
Ward
Walkley
Decision by
Delegated decision
Postcode
S6 3JN

Timeline

Dates from the published record

  1. 14 May 2021

    Received by Sheffield

  2. 24 May 2021

    Validated

    Checked as complete and ready for consideration.

  3. 10 Sep 2021

    Decision issued: Refuse

  4. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 18 Cromwell Street Sheffield S6 3RN (renumbered 16 And 18 Cromwell St S6 3RN)

    14/03260/FUL Submitted 3 Sep 2014 115m away

    Demolition of single-storey rear extensions and erection of two storey rear extension and conversion of existing dwelling to form two dwellinghouses (as amended 20.4.15)

    Granted Full applications Extension Demolition 10 docs
    Several homes
  • 36 Birkendale View Sheffield S6 3NN

    25/02815/TCA Submitted 22 Sep 2025 122m away

    Removal of tree (Birkendale Conservation Area)

    Granted Trees 5 docs
  • 32 Birkendale View Sheffield S6 3NN

    19/03396/TCA Submitted 15 Sep 2019 122m away

    Removal of a tree (Birkendale Conservation Area)

    Granted Trees 5 docs
  • 36 Cromwell Street Sheffield S6 3RN

    19/03463/HPN Submitted 20 Sep 2019 143m away

    Single-storey rear extension to dwellinghouse - the extension is 4.5m from the rear of the original dwellinghouse, ridge height no more than 3.45m and the height of the eaves is 2.325m

    Granted Prior approval Extension Roofing 8 docs
    Small domestic
  • Sheffield Buddhist Centre Howard Road Sheffield S6 3RT

    26/02402/LBC Submitted 10 Aug 2026 160m away

    92% historically approved · decision due ~5 Oct

    Replacement of roof covering, installation of solar panels, inverter and battery and 3 phase electricity supply and meter

    Awaiting decision Heritage and listed buildings Roofing
  • Sheffield Buddhist Centre Howard Road Sheffield S6 3RT

    26/02401/FUL Submitted 10 Aug 2026 160m away

    92% historically approved · decision due ~5 Oct

    Replacement of roof covering, installation of solar panels, inverter and battery and 3 phase electricity supply and meter

    Awaiting decision Full applications Roofing

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications