Skip to content
PlanIndex Get alerts
Menu

Planning application

67 Heavygate Avenue Sheffield S10 1QF

Granted Sheffield 21/02065/FUL Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retention of single-storey side extension, single-storey rear extension, rendered finish and raised decking to side of dwellinghouse (Amended description + plans 22.09.2021).

As published by the council, reference 21/02065/FUL

Application record

Reference
21/02065/FUL
Type
Full Planning Application
Status
Decided
Decision
Grant Conditionally
Received
4 May 2021
Validated
4 May 2021
Decided
15 Oct 2021
Ward
Walkley
Decision by
Delegated decision
Postcode
S10 1QF

Timeline

Dates from the published record

  1. 4 May 2021

    Received by Sheffield

  2. 15 Oct 2021

    Decision issued: Grant Conditionally

  3. 20 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 116 Bole Hill Road Sheffield S6 5DE

    24/00399/LD2 Submitted 7 Feb 2024 166m away

    Application for Lawful Development Certificate for the demolition of side extension and erection of detached garage (Application under Section 192)

    Refused Lawful development Extension Demolition 10 docs
  • 9 Bellhagg Road Sheffield S6 5BR

    21/02992/FUL Submitted 1 Jul 2021 176m away

    Erection of two-storey rear/side extension to dwellinghouse

    Granted Full applications Extension 8 docs
    Domestic
  • 33 Highton Street Sheffield S6 3TQ

    26/01698/FUL Submitted 8 Jun 2026 188m away

    92% historically approved · decision due ~12 Aug

    Hip to gable roof extension with front/rear dormer windows to dwellinghouse

    Awaiting decision Full applications Extension Loft or dormer +1
    Domestic
  • 86 Bellhagg Road Sheffield (Numbered 86A-D Bellhagg Road S6 5BS)

    14/02531/FUL Submitted 10 Jul 2014 199m away

    Alterations to dwellinghouse to form 4 flats

    Granted Full applications New dwelling 11 docs
    Several homes
  • 122 Bellhagg Road Sheffield S6 5BS

    14/02394/FUL Submitted 2 Jul 2014 199m away

    Two-storey extension to side of dwellinghouse (amended plans 08/12/14)

    Granted Full applications Extension 13 docs
    Domestic
  • Roberts Motor Bodies 32 Providence Road Sheffield S6 5BE

    26/02534/FUL Submitted 25 Aug 2026 272m away

    92% historically approved · decision due ~23 Oct

    Demolition of all buildings, erection of 6 dwellings with associated access, parking and landscaping

    Awaiting decision Full applications Demolition 26 docs
    Several homes

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications