Skip to content
PlanIndex Get alerts
Menu

Planning application

56 Bishopscourt Road Sheffield S8 9HP

Granted Sheffield 19/04200/HPN Householder Prior Notification

Works: Extension Roofing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single-storey rear extension to dwellinghouse - the extension is 5m from the rear of the original dwellinghouse, ridge height no more than 3.8m and the height of the eaves is 2.5m

As published by the council, reference 19/04200/HPN

Application record

Reference
19/04200/HPN
Type
Householder Prior Notification
Status
Decided
Decision
Prior Approval not Required
Received
18 Nov 2019
Validated
18 Nov 2019
Decided
19 Dec 2019
Ward
Gleadless Valley
Decision by
Delegated decision
Postcode
S8 9HP

Timeline

Dates from the published record

  1. 18 Nov 2019

    Received by Sheffield

  2. 19 Dec 2019

    Decision issued: Prior Approval not Required

  3. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • 33 Bishopscourt Road Sheffield S8 9HN

    21/02371/FUL Submitted 21 May 2021 85m away

    Demolition of conservatory, alterations to roof to form additional habitable space including gable extension and erection of rear dormer, and erection of two/single-storey rear extension in matching render to dwellinghouse

    Granted Full applications Extension Loft or dormer +1 7 docs
    Small domestic
  • 24 Bishopscourt Road Sheffield S8 9HP

    23/02500/FUL Submitted 2 Aug 2023 103m away

    Alterations to roof to form additional habitable space including hip to gable extension, raising of ridge height and erection of rear dormer and erection of front porch to dwellinghouse

    Granted Full applications Extension Loft or dormer +1 12 docs
    Small domestic
  • 5 Hollythorpe Crescent Sheffield S8 9NA

    26/02431/FUL Submitted 12 Aug 2026 145m away

    92% historically approved · decision due ~13 Oct

    Demolition of existing detached garage, erection of single-storey rear/side extension with rear raised patio, erection of rear shed and canopies to side doors of dwellinghouse

    Awaiting decision Full applications Extension Demolition
    Small domestic
  • 11 Hollythorpe Rise Sheffield S8 9NB

    26/00299/FUL Submitted 3 Feb 2026 173m away

    Demolition of detached store, erection of a two storey side extension with undercroft storage, and erection of a single storey rear extension to dwellinghouse

    Granted Full applications Extension Demolition 14 docs
    Small domestic
  • 68 Upper Albert Road Sheffield S8 9HT

    21/03491/FUL Submitted 2 Aug 2021 188m away

    Erection of rear glass balustrade balcony with stairs to garden of dwellinghouse

    Granted Full applications 12 docs
    Domestic
  • Pavement Opposite Junction With Hollythorpe Rise And Lees Hall Avenue Sheffield S8 9JE

    26/02299/TEL Submitted 31 Jul 2026 199m away

    92% historically approved · decision due ~25 Sep

    Erection of 15m mast with associated cabinets and ancillary development (Application to determine if approval required for siting and appearance)

    Awaiting decision Telecoms

In Sheffield

  • 26/02065/HPN Granted

    136 Colley Road Sheffield S5 9GU

    Single-storey rear extension to dwellinghouse - the extension is 3.85 metres from the rear of the original dwellinghouse, ridge height no more than 3.50 metres and the height of the eaves is 2.50 metres

    9 Jul 2026 Prior approval
  • 26/01548/HPN Refused

    257 Shirecliffe Road Sheffield S5 8XE

    Single-storey rear extension to dwellinghouse - the extension is 8 metres from the rear of the original dwellinghouse, ridge height no more than 4 metres and the height of the eaves is 3 metres

    26 May 2026 Prior approval
  • 26/01520/HPN Granted

    44 Thorpe Drive Sheffield S20 7JU

    Single-storey rear extension to dwellinghouse - the extension is 4.0 metres from the rear of the original dwellinghouse, ridge height no more than 3.31 metres and the height of the eaves is 2.52 metres

    21 May 2026 Prior approval
  • 26/00980/PVPN Granted

    Sherwin-Williams Diversified Brands Limited Thorncliffe Road Sheffield S35 2YP

    Installation of 1285 KWP PV solar system

    2 Apr 2026 Prior approval
  • 26/01218/PVPN Granted

    3 Ballard Hall Chase Sheffield S10 3HY

    Installation of solar panels to roof of dwellinghouse

    23 Apr 2026 Prior approval