Skip to content
PlanIndex Get alerts
Menu

Planning application

142 Albert Road Heeley Sheffield S8 9RA

Granted Sheffield 19/03804/FUL Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a two storey side extension, single storey rear extension and first floor roof terrace with stepped access.

As published by the council, reference 19/03804/FUL

Application record

Reference
19/03804/FUL
Type
Full Planning Application
Status
Decided
Decision
Granted As published: Grant Conditionally
Received
17 Oct 2019
Validated
17 Oct 2019
Decided
19 Dec 2019
Ward
Gleadless Valley
Decision by
Delegated decision
Postcode
S8 9RA

Timeline

Dates from the published record

  1. 17 Oct 2019

    Received by Sheffield

  2. 19 Dec 2019

    Decision issued: Grant Conditionally

  3. 22 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Sheffield granted permission on 19 December 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 78 Valley Road Meersbrook Sheffield S8 9FY

    19/03544/HPN Submitted 26 Sep 2019 100 yards away

    Single-storey rear extension to dwellinghouse - the extension is 4m from the rear of the original dwellinghouse, ridge height no more than 3.25m and the height of the eaves 3m

    Granted Prior approval Extension Roofing 5 docs
    Small domestic
  • 219 Shirebrook Road Sheffield S8 9RF

    14/04529/FUL Submitted 11 Dec 2014 150 yards away

    Single-storey rear extension and erection of front and rear dormer windows and addition of external rendered wall insulation

    Granted Full applications Extension Loft or dormer +1 12 docs
    Small domestic
  • 103 Meersbrook Park Road Sheffield S8 9FP

    21/03803/FUL Submitted 23 Aug 2021 200 yards away

    Erection of a rear wrap around dormer extension to form additional living accommodation

    Granted Full applications Extension Loft or dormer 17 docs
  • 87 Meersbrook Park Road Sheffield S8 9FP

    14/03089/FUL Submitted 20 Aug 2014 200 yards away

    Alterations to existing rear extension to form flat roof, provision of rear raised decking, provision of rear conopy to form outdoor covered area and rending to rear of dwellinghouse at ground floor level

    Granted Full applications Extension 6 docs
    Domestic
  • 4 Maxey Place Sheffield S8 9TA

    26/01670/LD2 Submitted 4 Jun 2026 250 yards away

    Application for Lawful Development Certificate for erection of dormer window to rear and repositioning of window to rear of dwellinghouse (Application under Section 192)

    Decided Loft or dormer Windows or glazing
    Domestic
  • 2 Maxey Place Sheffield S8 9TA

    26/01669/LD2 Submitted 4 Jun 2026 250 yards away

    90% historically approved · decision due ~30 Jul

    Application for Lawful Development Certificate for erection of dormer window to rear and repositioning of window to rear of dwellinghouse (Application under Section 192)

    Decided Loft or dormer Windows or glazing
    Domestic

In Sheffield

  • 26/03215/FUL Awaiting decision

    18 Basford Close Sheffield S9 5BX

    Erection of single-storey side/rear extension to dwellinghouse

    Received 26 Oct, published by the council 2 Nov 2026 Full applications
  • 26/03200/FUL Awaiting decision

    20 Bignor Road Sheffield S6 1JD

    Demolition of detached garage, erection of two-storey front extension, single-storey side extension and single-storey rear extension to dwellinghouse

    Received 26 Oct, published by the council 2 Nov 2026 Full applications
  • 26/03187/FUL Awaiting decision

    55 Scott Road Sheffield S4 7BG

    Erection of detached outbuilding

    Received 23 Oct, published by the council 2 Nov 2026 Full applications
  • 26/03191/FUL Awaiting decision

    74 Cardoness Road Sheffield S10 5RU

    Demolition of rear extension, erection of single-storey rear extension to dwellinghouse

    Received 23 Oct, published by the council 2 Nov 2026 Full applications
  • 26/03177/FUL Awaiting decision

    Car Park 12 Furnival Road Sheffield S4 7YB

    Use of ancillary parking for offices as a standalone car park

    Received 23 Oct, published by the council 2 Nov 2026 Full applications