Skip to content
PlanIndex Get alerts
Menu

Planning application

126 Springfield Road Sheffield S7 2GF

Granted Sheffield 14/04217/FUL Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of two-storey side extension and single-storey rear extension

As published by the council, reference 14/04217/FUL

Application record

Reference
14/04217/FUL
Type
Full Planning Application
Status
Decided
Decision
Grant Conditionally
Received
17 Nov 2014
Validated
17 Nov 2014
Decided
12 Jan 2015
Ward
Ecclesall
Decision by
Delegated decision
Postcode
S7 2GF

Timeline

Dates from the published record

  1. 17 Nov 2014

    Received by Sheffield

  2. 12 Jan 2015

    Decision issued: Grant Conditionally

  3. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 116 Springfield Road Sheffield S7 2GF

    14/01253/FUL Submitted 4 Apr 2014 0m away

    Demolition of rear conservatory and partial demolition of detached garage, single-storey side/rear extension and two-storey rear extension to dwellinghouse

    Granted Full applications Extension Demolition 5 docs
    Small domestic
  • 110 Springfield Road Sheffield S7 2GF

    23/02484/FUL Submitted 1 Aug 2023 2m away

    Demolition of detached garage, erection of two-storey side extension, single-storey front and rear extensions and dormer window to rear of dwellinghouse (Amended Plans Received 28th September 2023)

    Granted Full applications Extension Loft or dormer +2 11 docs
    Small domestic
  • 17 Helston Rise Sheffield S7 2GL

    15/00459/FUL Submitted 5 Feb 2015 92m away

    Two-storey rear and single-storey side extension to dwellinghouse

    Granted Full applications Extension 8 docs
    Small domestic
  • 43 Helston Rise Sheffield S7 2GL

    18/04478/TPO Submitted 28 Nov 2018 92m away

    Pruning of a tree (Tree Preservation Order No 808/178)

    Refused Trees 6 docs
  • 88 Springfield Road Sheffield S7 2GF

    19/03891/FUL Submitted 24 Oct 2019 117m away

    Erection of single-storey rear extension to dwellinghouse

    Granted Full applications Extension 9 docs
    Small domestic
  • 4 Springfield Avenue Sheffield S7 2GA

    26/01418/FUL Submitted 14 May 2026 142m away

    Alterations to roof space to form habitable accommodation including formation of gable end and provision of a rear dormer window

    Granted Full applications Loft or dormer Windows or glazing 11 docs

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications