Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Nether Ley Court Sheffield S35 1AF

Granted Sheffield 14/03889/FUL Full Planning Application

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing garage and erection of a two-storey/single-storey side/rear extension to dwellinghouse, including a garage

As published by the council, reference 14/03889/FUL

Application record

Reference
14/03889/FUL
Type
Full Planning Application
Status
Decided
Decision
Grant Conditionally
Received
17 Oct 2014
Validated
22 Oct 2014
Decided
17 Dec 2014
Ward
East Ecclesfield
Parish
Ecclesfield Parish Council
Decision by
Delegated decision
Postcode
S35 1AF

Timeline

Dates from the published record

  1. 17 Oct 2014

    Received by Sheffield

  2. 22 Oct 2014

    Validated

    Checked as complete and ready for consideration.

  3. 17 Dec 2014

    Decision issued: Grant Conditionally

  4. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Former Swimming Baths Burncross Road Sheffield S35 1RX

    19/04560/COND2 Submitted 12 Apr 2021 97m away

    Application to approve details relating to condition numbers 3. and 4. Intrusive Site Investigation; 5. Surface Water Drainage: 6. Wheel Cleaning: 7. Plot/Floor Levels: 8. Renewable/Low Carbon Energy: 9. and 10. Highway Improvements: 16. RMS validation: 17. External materials: 18. Landscape scheme: 20. Bird/Bat Box: 21. Boundary treatment: imposed by 19/04560/FUL

    Decided Conditions 32 docs
  • 28A Burncross Road Sheffield S35 1SF

    26/00990/CHU Submitted 7 Apr 2026 131m away

    92% historically approved · decision due ~30 Jul

    Use of flat (Use Class C3) as a commercial unit (Use Class E(e))

    Decided
  • Thorncliffe Cricket And Social Club Lound Side Sheffield S35 2US

    26/02032/FUL Submitted 8 Jul 2026 178m away

    92% historically approved · decision due ~17 Sep

    Use of public house (Sui Generis) as a nursery and day care centre (E(f))

    Awaiting decision Full applications 12 docs
  • Yorkshire Bank 12 Lound Side Sheffield S35 2UN

    26/02076/FUL Submitted 10 Jul 2026 240m away

    92% historically approved · decision due ~4 Sep

    Use of former bank as a bar/restaurant (Sui Generis) with associated alterations including creation of external seating areas

    Awaiting decision Full applications
  • Yorkshire Bank 12 Lound Side Sheffield S35 2UR

    22/03233/FUL Submitted 1 Sep 2022 243m away

    Demolition of former bank and erection of a 4-storey high building to provide 25no. apartments (use class C3) with 2 ground floor commercial units (use class E) and associated works (Amended plans and Description)

    Refused Full applications New dwelling Demolition 61 docs
    Major scheme
  • 33 Hunshelf Road Burncross Sheffield S35 1UF

    26/01984/FUL Submitted 2 Jul 2026 294m away

    92% historically approved · decision due ~27 Aug

    Erection of first floor front extension to dwellinghouse

    Awaiting decision Full applications Extension
    Domestic

In Sheffield

  • 26/02602/FUL Awaiting decision

    155 Derbyshire Lane Sheffield S8 8SA

    Widening of the existing driveway crossover

    2 Sep 2026 Full applications
  • 26/02604/FUL Awaiting decision

    St Johns Church Bernard Street Sheffield S2 5PU

    Replacement windows

    2 Sep 2026 Full applications
  • 26/02589/FUL Awaiting decision

    The Anvil 109 Clough Road Sheffield S2 4TB

    Installation of CAT Ladders on east, south and west elevation of building and associated works

    1 Sep 2026 Full applications
  • 26/02587/FUL Awaiting decision

    28 Vernon Road Sheffield S17 3QE

    Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse

    1 Sep 2026 Full applications
  • 26/02579/FUL Awaiting decision

    28 Grove Road Millhouses Sheffield S7 2GZ

    Erection of single-storey rear extension to dwellinghouse

    1 Sep 2026 Full applications