Skip to content
PlanIndex Get alerts
Menu

Planning application

Lowedges Road Fire Station Lowedges Road Sheffield S8 7JN

Granted Sheffield 14/03482/DPN Demolition Prior Notification

Works: Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of 5-storey drill training tower down to single storey level

As published by the council, reference 14/03482/DPN

Application record

Reference
14/03482/DPN
Type
Demolition Prior Notification
Status
Decided
Decision
Grant Prior Notification
Received
18 Sep 2014
Validated
18 Sep 2014
Decided
14 Oct 2014
Ward
Beauchief & Greenhill
Decision by
Delegated decision
Postcode
S8 7JN

Site history

Applications at this address on the Sheffield register

This site has had 2 applications since 2014: 1 approved, 0 refused.

  • 26/02257/FUL Awaiting decision

    Lowedges Road Fire Station Lowedges Road Sheffield S8 7JN

    Erection of single-storey timber gazebo with accessible ramp

    Submitted 27 Jul 2026 Full applications

Timeline

Dates from the published record

  1. 18 Sep 2014

    Received by Sheffield

  2. 14 Oct 2014

    Decision issued: Grant Prior Notification

  3. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Sheffield granted permission on 14 October 2014, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Lowedges Road Fire Station Lowedges Road Sheffield S8 7JN

    26/02257/FUL Submitted 27 Jul 2026 0m away

    92% historically approved · decision due ~21 Sep

    Erection of single-storey timber gazebo with accessible ramp

    Awaiting decision Full applications
    Small domestic
  • 370 Lowedges Road Sheffield S8 7JF

    21/02039/FUL Submitted 1 May 2021 148m away

    Erection of a single-storey rear extension to dwellinghouse

    Granted Full applications Extension 9 docs
    Small domestic
  • 110 Bradway Road Sheffield S17 4QW

    23/02693/FUL Submitted 22 Aug 2023 293m away

    Alterations and extension to detached ancillary accommodation within the curtilage of No. 110 Bradway Road to form a dormer bungalow, including raising the ridge height and erection of dormer extension on the northern elevation and erection of a new detached dormer bungalow, including provision of parking/turning facilities and an access driveway to the dwellings and erection of a brick built store for use by No. 110 Bradway Road

    Refused Full applications Extension Loft or dormer +1 15 docs
  • Dore And Totley Golf Club Bradway Road Sheffield S17 4QR

    20/04310/FUL Submitted 2 Dec 2020 319m away

    Erection of a single-storey extension to clubhouse

    Granted Full applications Extension 13 docs
    Small domestic
  • May Cottage 50 Bradway Road Sheffield S17 4QU

    21/03591/LBC Submitted 9 Aug 2021 339m away

    Replacement of windows and doors

    Granted Heritage and listed buildings Windows or glazing 15 docs
  • 46 Bradway Road Sheffield S17 4QU

    26/01318/LBC Submitted 5 May 2026 345m away

    92% historically approved · decision due ~9 Jul

    Replacement windows and external doors

    Awaiting decision Heritage and listed buildings Windows or glazing 10 docs

In Sheffield

  • 26/02065/HPN Granted

    136 Colley Road Sheffield S5 9GU

    Single-storey rear extension to dwellinghouse - the extension is 3.85 metres from the rear of the original dwellinghouse, ridge height no more than 3.50 metres and the height of the eaves is 2.50 metres

    9 Jul 2026 Prior approval
  • 26/01548/HPN Refused

    257 Shirecliffe Road Sheffield S5 8XE

    Single-storey rear extension to dwellinghouse - the extension is 8 metres from the rear of the original dwellinghouse, ridge height no more than 4 metres and the height of the eaves is 3 metres

    26 May 2026 Prior approval
  • 26/01520/HPN Granted

    44 Thorpe Drive Sheffield S20 7JU

    Single-storey rear extension to dwellinghouse - the extension is 4.0 metres from the rear of the original dwellinghouse, ridge height no more than 3.31 metres and the height of the eaves is 2.52 metres

    21 May 2026 Prior approval
  • 26/00980/PVPN Granted

    Sherwin-Williams Diversified Brands Limited Thorncliffe Road Sheffield S35 2YP

    Installation of 1285 KWP PV solar system

    2 Apr 2026 Prior approval
  • 26/01218/PVPN Granted

    3 Ballard Hall Chase Sheffield S10 3HY

    Installation of solar panels to roof of dwellinghouse

    23 Apr 2026 Prior approval