Planning application
47 Ashland Road Sheffield S7 1RH
Works: Extension Demolition Windows or glazing Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing rear extension and alterations and extensions to dwellinghouse including erection of two-storey rear extension, replacement of front windows and removal of existing cement render
As published by the council, reference 14/01714/FUL
Application record
- Reference
- 14/01714/FUL
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Grant Conditionally
- Received
- 13 May 2014
- Validated
- 13 May 2014
- Decided
- 7 Jul 2014
- Ward
- Nether Edge And Sharrow
- Decision by
- Delegated decision
- Postcode
- S7 1RH
Site history
Applications at this address on the Sheffield register
This site has had 2 applications since 2014: 2 approved, 0 refused.
-
16/00559/TCA Granted
47 Ashland Road Sheffield S7 1RH
Removal of a tree (Nether Edge Conservation Area)
Timeline
Dates from the published record
-
13 May 2014
Received by Sheffield
-
7 Jul 2014
Decision issued: Grant Conditionally
-
30 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Sheffield granted permission on 7 July 2014, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
69 Ashland Road Sheffield S7 1RH
Removal of trees (Nether Edge Conservation Area)
Granted Trees 4 docs -
55 Ashland Road Sheffield S7 1RH
Pruning and removal of trees (Nether Edge Conservation Area)
Granted Trees 5 docs -
71 Ashland Road Sheffield S7 1RH
Removal/pruning of trees (TPO 808/106 and Nether Edge Conservation Area)
Granted Trees 5 docs -
37 Ashland Road Sheffield S7 1RH
Removal of a tree (Nether Edge Conservation Area)
Granted Trees 4 docs -
49 Ashland Road Sheffield S7 1RH
Pruning and removal of trees (Nether Edge Conservation Area)
Granted Trees 3 docs -
15 Ashland Road Sheffield S7 1RH
Pruning of trees (Nether Edge Conservation Area)
Granted Trees 4 docs
Other full applications
In Sheffield
-
26/02602/FUL Awaiting decision
155 Derbyshire Lane Sheffield S8 8SA
Widening of the existing driveway crossover
-
26/02604/FUL Awaiting decision
St Johns Church Bernard Street Sheffield S2 5PU
Replacement windows
-
26/02589/FUL Awaiting decision
The Anvil 109 Clough Road Sheffield S2 4TB
Installation of CAT Ladders on east, south and west elevation of building and associated works
-
26/02587/FUL Awaiting decision
28 Vernon Road Sheffield S17 3QE
Demolition of detached garage and erection of a single/two storey rear extension to dwellinghouse
-
26/02579/FUL Awaiting decision
28 Grove Road Millhouses Sheffield S7 2GZ
Erection of single-storey rear extension to dwellinghouse