Planning application
Bloch Wind Farm South Of B7068 Near Langholm Dumfries And Galloway
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
The proposed development will comprise of a wind farm and battery energy storage system, comprising up to 21 three-bladed horizontal axis wind turbines with a maximum ground to blade tip height of 230 metres, with a total power output of approximately 126MW. The turbines would be nominally rated at 6MW. The battery energy storage system will be rated at approximately 45MW.
As published by the council, reference 22/01848/NECON
Application record
- Reference
- 22/01848/NECON
- Type
- Neighbouring Local Authorities
- Status
- Registered
- Decision
- Neighbour Consultation Decision
- Received
- 25 Nov 2022
- Validated
- 25 Nov 2022
- Decided
- 4 Jan 2023
- Ward
- Outwith SBC Adminstrative Boundary
- Parish
- Outwith SBC Adminstrative Boundary
Timeline
Dates from the published record
-
25 Nov 2022
Received by Scottish Borders
-
4 Jan 2023
Decision issued: Neighbour Consultation Decision
-
5 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Scottish Borders has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Scottish Borders's portal will say. Our guide explains the common types.