Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To Rear High Point Academy Friar Park Road Wednesbury

Granted Sandwell DC/25/71065 Major - Variations of permissions

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed variation of conditions 1, 3, 4, 5, 6, 7, 8, 9, 10, 13, 15, 16, 17 and 18 of planning application DC/23/68742 (Proposed 105 dwellings with associated public open space) to facilitate a change in the red line boundary to accommodate a second phase of development.

As published by the council, reference DC/25/71065

Application record

Reference
DC/25/71065
Type
Major - Variations of permissions
Status
Decided
Decision
Grant Permission Subject to Conditions
Received
29 Sep 2025
Validated
9 Oct 2025
Decided
28 Nov 2025
Ward
Friar Park & Stone Cross
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 29 Sep 2025

    Received by Sandwell

  2. 9 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 28 Nov 2025

    Decision issued: Grant Permission Subject to Conditions

  4. 8 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

31 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Sandwell

  • DC/26/71435 Granted

    195 Princess Parade High Street West Bromwich B70 7QZ

    Proposed first floor and second floor extensions with two front dormer windows to create six studio flats and one one-bedroom flat; and subdivision of the ground floor into two separate retail units.

    9 Feb 2026 Full applications
  • DC/26/71872 Refused

    13 Devonshire Road Smethwick B67 7NW

    Conversion of part of the existing dwellinghouse to form 1 self-contained studio flat, with associated internal alterations.

    25 Jun 2026 Full applications
  • DC/26/71812 Granted

    Complete Dental 621 - 623 Bearwood Road Smethwick B66 4BL

    Proposed first floor rear extension, loft conversion, front and rear dormer windows (Revision to refused planning permission DC/25/71319)

    4 Jun 2026 Full applications
  • DC/26/72016 Awaiting decision

    4 Lightwoods Hill Smethwick B67 5DZ

    Demolition of existing dwelling and proposed 1 No. detached residential dwelling and associated works.

    13 Aug 2026 Full applications
  • DC/26/71793 Granted

    124 Cheshire Road Smethwick B67 6DW

    Proposed change of use from 6 No. bedroom (6 No. person) HMO to 7 No. bedroom (7 No. person) HMO, single storey rear extension, 2 No. basement light wells to front and covered bin/bike store to rear (Revision to refused planning applications DC/24/70106 and DC/25/71238).

    29 May 2026 Full applications