Planning application
84, No. 84 & No. 84A, Rocky Lane, Monton, Salford, M30 9LY
Works: Extension Loft or dormer Small domestic
Read from the description, not a valuation. How we read the register
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Erection of single storey side extension, new front porch/entrance, second floor loft conversion and side/rear dormers
As published by the council, reference PA/2025/1687
Application record
- Reference
- PA/2025/1687
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Refuse
- Received
- 13 Feb 2026
- Validated
- 13 Feb 2026
- Decided
- 10 Apr 2026
- Ward
- Eccles Ward
- Decision by
- Delegated Decision
- Postcode
- M30 9LY
Timeline
Dates from the published record
-
13 Feb 2026
Received by Salford
-
10 Apr 2026
Decision issued: Refuse
-
27 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
-
-
74 Rocky Lane, ECCLES, MANCHESTER, M30 9LY
T1 sycamore - fell. T2 lime tree - crown lift to 7m.
Granted Trees 8 docs -
-
72 Rocky Lane Monton Eccles
Change of use of first floor bedroom to dental surgery
Withdrawn Full applications -
106 ROCKY LANE, ECCLES, MANCHESTER, M30 9LY
84% historically approved · decision due ~8 Apr
Alterations to existing semi-detached house to include alterations to rear windows and construction of a raised access deck. Creation of new vehicular access and parking area to front. Construction of 2 detached dwellings on adjacent land to include altered vehicular access from the road and creation of new off road parking and manoeuvring area.
Awaiting decision Full applications New dwelling Windows or glazing 23 docs
Other full applications applications
In Salford
-
PA/2026/0658 Refused
69 Broom Lane, Salford, M7 4FF
Retention of 1no. advertising timber board structure
-
PA/2026/0324 Granted
1 Eccles Fold, Eccles, Manchester, M30 0NT
Cladding remediation of existing external walls with new facing materials to match existing, and increased height of parapet walls (max. 150mm)
-
PA/2025/1323 Granted
8 Billington Road, SWINTON, MANCHESTER, M27 8SW
Proposed conversion and alterations to external elevations of existing outbuilding to form dwelling
-
PA/2026/1071 Awaiting decision
P P Profiles, Vere Street, Salford, M50 2GQ
Continued use of the premises for storage and distribution (Use Class B8).
-
PA/2026/0937 Refused
Office At, 16 Eccles Old Road, Salford, M6 7AF
Change of use from a first floor office (Use Class E) to 1no. residential studio (Use Class C3)