Skip to content
PlanIndex Get alerts
Menu

Planning application

259 Monton Road, ECCLES, MANCHESTER, M30 9PS

Refused Salford PA/2024/1859 Full planning permission

Works: Extension Several homes

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Proposed three storey rear extension and change of use of the existing first floor office space to create 6no. dwellings.

As published by the council, reference PA/2024/1859

Application record

Reference
PA/2024/1859
Type
Full planning permission
Status
Decision Made
Decision
Refuse
Received
23 Jan 2025
Validated
23 Jan 2025
Decided
18 Mar 2025
Ward
Eccles Ward
Decision by
Delegated Decision
Postcode
M30 9PS

Timeline

Dates from the published record

  1. 23 Jan 2025

    Received by Salford

  2. 18 Mar 2025

    Decision issued: Refuse

  3. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 257 Monton Road Eccles M30 9PS

    16/69013/ADV Submitted 22 Oct 2016 0m away

    Installation of 1no. illuminated fascia sign to front elevation over entrance door set

    Granted Advertising 6 docs
  • 257 Monton Road, Eccles, Manchester, M30 9PS

    PA/2024/0055 Submitted 17 Feb 2024 0m away

    Erection of an awning and enclosed outdoor seating area to existing front elevation

    Granted Full applications 7 docs
  • 237-239 Monton Road, Eccles, Manchester, M30 9PS

    PA/2025/1796 Submitted 16 Feb 2026 0m away

    Erection of a single storey rear extension with roof light and extraction flue, new rear door and steel escape stairs, 3 no. ASHP condenser units, bin store, new shop frontage including retractable canopy and outside seating area (to facilitate the use of the premises as a restaurant)

    Granted Full applications Extension Loft or dormer 37 docs
    Small domestic
  • 255 Monton Road, Eccles, M30 9PS

    PA/2024/0103 Submitted 23 Jan 2024 0m away

    Erection of new aluminium pergola with a glazed door/windows to front elevation

    Granted Full applications Windows or glazing 9 docs
  • 237-239 Monton Road, ECCLES, MANCHESTER, M30 9PS

    OTH/2026/1014 Submitted 20 Jul 2026 0m away

    Request for confirmation of compliance of condition 3 (Coal mining) & 5 (Fume extraction) attached to planning permission PA/2025/1796

    Decided Conditions 5 docs
  • 259 Monton Road, ECCLES, MANCHESTER, M30 9PS

    NOT/2025/0911 Submitted 1 Jul 2025 0m away

    Application to determine if prior approval is required for a proposed change of use of first floor office (use class E) to a 2-bedroom apartment (use class C3).

    Granted Prior approval 14 docs

In Salford

  • PA/2026/0658 Refused

    69 Broom Lane, Salford, M7 4FF

    Retention of 1no. advertising timber board structure

    9 Jun 2026 Full applications
  • PA/2026/0324 Granted

    1 Eccles Fold, Eccles, Manchester, M30 0NT

    Cladding remediation of existing external walls with new facing materials to match existing, and increased height of parapet walls (max. 150mm)

    5 Mar 2026 Full applications
  • PA/2025/1323 Granted

    8 Billington Road, SWINTON, MANCHESTER, M27 8SW

    Proposed conversion and alterations to external elevations of existing outbuilding to form dwelling

    22 Sep 2025 Full applications
  • PA/2026/1071 Awaiting decision

    P P Profiles, Vere Street, Salford, M50 2GQ

    Continued use of the premises for storage and distribution (Use Class B8).

    27 Aug 2026 Full applications
  • PA/2026/0937 Refused

    Office At, 16 Eccles Old Road, Salford, M6 7AF

    Change of use from a first floor office (Use Class E) to 1no. residential studio (Use Class C3)

    2 Jul 2026 Full applications