Planning application
Plot A3, New Bailey, Salford, M3 5EN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of conditions 2 (approved plans) and 20 (green wall) following a grant of planning permission 20/76306/FUL
As published by the council, reference 21/77756/FUL
Application record
- Reference
- 21/77756/FUL
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Approve
- Received
- 26 May 2021
- Validated
- 26 May 2021
- Decided
- 30 Jun 2021
- Ward
- Ordsall Ward
- Decision by
- Delegated Decision
- Postcode
- M3 5EN
Timeline
Dates from the published record
-
26 May 2021
Received by Salford
-
30 Jun 2021
Decision issued: Approve
-
27 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
1,203 applications on PlanIndex · across 153 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
44 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Plot A3, New Bailey, Salford, M3 5EN
Application for non-material amendment following the grant of planning permission 21/77756/FUL for the relocation of the access door into the ground floor unit and the addition of windows at the mezzanine level (relating to plot A3)
Granted Amendments Windows or glazing 7 docs -
Plot A3, New Bailey, Salford, M3 5EN
Request for confirmation of compliance of condition 17 (Phase 2 Site Investigation report) attached to planning permission 21/77756/FUL
Decided Conditions 5 docs -
Plot A3, New Bailey, Salford, M3 5EN
Request for confirmation of compliance of condition 2 (materials) and partial compliance of condition 19 (facade strategy, plant species) attached to planning permission 21/77756/FUL
Decided Conditions 7 docs -
Plot A1 of the Salford Central Masterplan, Irwell Street, M3 5EN
Request for Screening Opinion in respect of a full planning application for the construction of an 18 storey apartment building comprising 153 no. 1 to 3 bed residential apartments with associated amenity space and landscaping works ('the Proposed Development')
Decided Outline New dwelling -
Plot A1 Salford Central Masterplan, Irwell Street, Salford, M3 5EN
Request for confirmation of partial compliance of condition 3 (Construction Method Statement, for enabling works only) attached to planning permission PA/2024/1691 (follow up to OTH/2026/0398)
Decided Conditions 3 docs -
Plot A1 Salford Central Masterplan, Irwell Street, Salford, M3 5EN
84% historically approved · decision due ~15 Oct
Proposed temporary (24-month) one-way traffic junction from Stanley Street onto Trinity Way to facilitate the redevelopment of the adjacent Plot A1, New Bailey site, in connection with planning application PA/2024/1691.
Awaiting decision Full applications 2 docs
Other full applications applications
In Salford
-
PA/2026/0658 Refused
69 Broom Lane, Salford, M7 4FF
Retention of 1no. advertising timber board structure
-
PA/2026/0324 Granted
1 Eccles Fold, Eccles, Manchester, M30 0NT
Cladding remediation of existing external walls with new facing materials to match existing, and increased height of parapet walls (max. 150mm)
-
PA/2025/1323 Granted
8 Billington Road, SWINTON, MANCHESTER, M27 8SW
Proposed conversion and alterations to external elevations of existing outbuilding to form dwelling
-
PA/2026/1071 Awaiting decision
P P Profiles, Vere Street, Salford, M50 2GQ
Continued use of the premises for storage and distribution (Use Class B8).
-
PA/2026/0937 Refused
Office At, 16 Eccles Old Road, Salford, M6 7AF
Change of use from a first floor office (Use Class E) to 1no. residential studio (Use Class C3)