Skip to content
PlanIndex Get alerts
Menu

Planning application

2026/0889/TLP

Site Adjacent To Stamford Road Ryhall Rutland

Awaiting decision Rutland Prior - Telecommunications

Proposal

Proposed Arqiva smart metering 1No. omni at 13.45m mean mounted on proposed 12m streetworks pole. Proposed Arqiva smart metering 1No. GPS antenna at 12.0m mean mounted on proposed streetworks pole. Proposed Arqiva smart metering 1No. 3G omni antenna at 4.19m mean mounted on proposed streetworks pole. Proposed Arqiva smart metering equipment enclosure to be installed on a root foundation.

As published by the council, reference 2026/0889/TLP

Timeline

Dates from the published record

  1. 16 Jul 2026

    Received by Rutland

  2. 25 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Rutland for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

  • S26/1188 Awaiting decision

    Land To The North Of Stamford

    Submission of details reserved by Conditions 6 (Phasing Plan) of S23/0055

    10 Jul 2026 335m away Conditions

In Rutland

  • 2026/0807/TLP Awaiting decision

    Grass Verge To South Of Woolfox Depot Woolfox Lodge Road Empingham Rutland LE15 7QT

    Installation of a 20m streetworks monopole with 9 no. antenna apertures, 5 no. equipment cabinets, 2 no. transmission dishes and development ancillary thereto.

    30 Jun 2026 Telecoms
  • 2026/0300/TLP Granted

    Arqiva Telecom Mast (165739) Wardley Hill Wardley Rutland

    Installation of replacement 22.5m monopole mast with headframe to accommodate 3 no. replacement antenna, ancillary radio equipment and 2 no. 0.3m and 1 no. 0.6m transmission dishes, along with ancillary development thereto.

    11 Mar 2026 Telecoms
  • 2026/0288/TLP Granted

    Building 26 Mallard Park Meadow Park Industrial Estate Essendine Rutland PE9 4FA

    Upgrade the existing telecommunications base station comprising the removal of the existing 3 no. antennas and other associated apparatus mounted on antenna support poles and replacement with 3 no. antennas , 1 no. 300mm diameter dish antenna, 1 no. 600mm diameter dish antenna, a relocated 1 no. 200mm diameter dish antenna, 1 no. GPS module, all mounted on a new 7.5m lattice stub mast, with a height to the top of the antennas at 19.0 m above ground level, associated radio units, the relocation of 1 no. existing equipment cabinet and other ancillary works.

    6 Mar 2026 Telecoms
  • 2026/0213/TLP Withdrawn

    Grass Verge To South Of Woolfox Depot Woolfox Lodge Road Empingham Rutland LE15 7QT

    Installation of a monopole with 9 no. antenna apertures, 5 no. equipment cabinets, 2 no. transmission dishes and development ancillary thereto.

    20 Feb 2026 Telecoms
  • 2026/0015/TLP Granted

    Telecommunications Mast 6026 Peterborough Road Tixover Rutland

    The proposed upgrade of an existing telecommunications base station comprising the removal of an existing 15m monopole (overall height of 18.5m) and replacement with a 20m monopole with headframe supporting 3 no antennas and 3 no. dish, together with the removal of 2 no existing equipment cabinets and the installation of 2 no new equipment cabinets and ancillary development thereto.

    6 Jan 2026 Telecoms