Skip to content
PlanIndex Get alerts
Menu

Planning application

2026/0786/FUL

Woodbine Cottage 11 Main Street Egleton Rutland LE15 8AF

Awaiting decision Rutland Full Application

Proposal

Air Source Heat Pump on North elevation wall of detached garage.

As published by the council, reference 2026/0786/FUL

Timeline

Dates from the published record

  1. 24 Jun 2026

    Received by Rutland

  2. 20 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Rutland for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2021/0573/LBA Granted

    Hanbury House 2 Main Street Egleton Rutland LE15 8AF

    Additional bathroom roof vent, roof flashings and changing the existing bay window french door in to a window with stone infill

    5 May 2021 119m away Heritage and listed buildings
  • 2026/0747/PTA Awaiting decision

    The Old Bakehouse 6 Hambleton Road Egleton Rutland LE15 8AE

    (T1) 1 no. Willow - Fell and replant.

    18 Jun 2026 120m away Trees
  • 2026/0320/PTA Granted

    The Old Bakehouse 6 Hambleton Road Egleton Rutland LE15 8AE

    T1 - Willow - Repollard by removing all regenerative growth back to main stem - 4m reduction.

    16 Mar 2026 120m away Trees
  • 2021/0572/FUL Granted

    Hanbury House 2 Main Street Egleton Rutland LE15 8AF

    Additional bathroom roof vent, roof flashings and changing the existing bay window french door in to a window with stone infill

    5 May 2021 121m away Full applications
  • 2026/0785/CLP Awaiting decision

    9 Orchard Close Egleton Rutland LE15 8AG

    Installation of photo voltaic panels to part of the existing house and garage roof.

    24 Jun 2026 122m away Lawful development
  • 2025/1167/CAT Granted

    Hanbury House 2 Main Street Egleton Rutland LE15 8AF

    4m reduction in height to Holly tree

    15 Sep 2025 127m away Trees

In Rutland

  • 2026/0715/FUL Granted

    Henlopen House Church Road Ketton Rutland PE9 3RD

    Provision of new car port.

    11 Jun 2026 Full applications
  • 2026/0589/FUL Refused

    Land At Rosedene Main Street Thistleton Rutland

    Retrospective siting of 7 no. storage containers.

    18 May 2026 Full applications
  • 2026/0934/FUL Awaiting decision

    Grange Farm Ridlington Road Brooke Rutland LE15 8GQ

    Section 73A application to retain the mobile home granted approval under reference No 2024/0144/FUL (temporary accommodation) for a further 2 years.

    27 Jul 2026 Full applications
  • 2025/1555/FUL Withdrawn

    Fox And Hounds Inn 19 The Green Exton Rutland LE15 8AP

    Single storey orangery extension and creation of new ground floor terrace to the Fox & Hounds Hotel, Exton

    28 Nov 2025 Full applications
  • 2026/0907/FUL Awaiting decision

    Adjacent To Co Op Superstore Burley Road Oakham Rutland

    Construction of padel tennis facility to provide 3 no. covered padel courts with associated changing and support facilities.

    22 Jul 2026 Full applications