Planning application

Seaton House 3 Seaton Road Barrowden Rutland LE15 8EN

Granted Rutland 2026/0624/FUL Full applications

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Front toilet extension to create downstairs shower facility

As published by the council, reference 2026/0624/FUL

Application record

Reference
2026/0624/FUL
Category
Full applications
Status
Decided
Decision
Granted As published: Approve
Received
25 May 2026
Validated
28 May 2026
Ward
Ketton Ward
Parish
Barrowden Parish Council
Decision by
Delegated Decision
Postcode
LE15 8EN

Timeline

Dates from the published record

  1. 25 May 2026

    Received by Rutland

  2. 28 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 20 Jul 2026

    Added to PlanIndex

Documents

The council's own list, drawings first

12 documents on file for this application

Drawings (7)

  • Proposed floor plan 29 May 2026
  • Proposed elevations 29 May 2026
  • Block plan of the site 29 May 2026
  • Existing floor plan 29 May 2026
  • Existing elevations 29 May 2026
  • Existing roof plan 29 May 2026
  • Existing location plan 29 May 2026

Everything on file (12)

  • DECISION NOTICE Decision Notice · 17 Jul 2026
  • OFFICER DELEGATED REPORT Report · 14 Jul 2026
  • INTERESTED PARTY - 1 SEATON ROAD, BARROWDEN Representations · 10 Jun 2026
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 29 May 2026
  • ELEVATIONS Drawing Proposed · 29 May 2026
  • BLOCK PLAN OF THE SITE Drawing Existing/Proposed · 29 May 2026
  • ROOF PLAN - EXISTING Drawing Existing · 29 May 2026
  • FLOOR PLAN Drawing Proposed · 29 May 2026
  • FLOOR PLAN - EXISTING Drawing Existing · 29 May 2026
  • ELEVATIONS Drawing Existing · 29 May 2026
  • LOCATION PLAN Drawing Existing · 29 May 2026
  • NOTIFIED NEIGHBOUR LIST Notified Neighbour List · 29 May 2026

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you the drawings on every job in your area. 14 days free.

What this grant of permission means

Rutland granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Rutland

  • 2026/1089/FUL Granted

    Old Bakehouse Stables 10 Thompsons Lane Seaton Rutland LE15 9JA

    Demolition of existing single storey section and erection of new two storey extension.

    Received 1 Sep, published by the council 24 Sep 2026 Full applications
  • 2026/1420/FUL Awaiting decision

    The Bungalow 43A Aldgate Ketton Rutland PE9 3TD

    Demolition of rear conservatory and side boiler room, erection of single-storey rear and side extension, replacement windows/doors, render external walls, new raised deck, installation of air source heat pump, alterations to internal layout and external hard/soft landscaping.

    Received 17 Nov, published by the council 20 Nov 2026 Full applications
  • 2026/0122/FUL Granted

    Orchard House Main Street Barrow Rutland LE15 7PE

    Two storey rear extension with pitched roof

    Received 30 Jan, published by the council 20 Jul 2026 Full applications
  • 2026/0840/FUL Granted

    Middle Farm Main Street Barrow Rutland LE15 7PE

    Two storey extension.

    Received 3 Jul, published by the council 20 Jul 2026 Full applications
  • 2026/1415/FUL Awaiting decision

    40 Stamford Road Oakham Rutland LE15 6JA

    Section 73 application to vary Condition 2 (Approved Plans) of application 2026/0383/FUL. (Two storey side and rear extension and single storey rear extension. Vehicular timber gates to front. Full property rendering).

    Received 16 Nov, published by the council 18 Nov 2026 Full applications