Planning application
2026/0509/FUL
Rivendell 5A Bourne Road Essendine Rutland PE9 4LH
Proposal
First floor extension and change of roof pitch.
As published by the council, reference 2026/0509/FUL
Timeline
Dates from the published record
-
29 Apr 2026
Received by Rutland
-
22 Jun 2026
Decision issued: Approve
-
20 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2025/1027/FUL Refused
Rivendell 5A Bourne Road Essendine Rutland PE9 4LH
Upper floor extension
-
2026/0288/TLP Granted
Building 26 Mallard Park Meadow Park Industrial Estate Essendine Rutland PE9 4FA
Upgrade the existing telecommunications base station comprising the removal of the existing 3 no. antennas and other associated apparatus mounted on antenna support poles and replacement with 3 no. antennas , 1 no. 300mm diameter dish antenna, 1 no. 600mm diameter dish antenna, a relocated 1 no. 200mm diameter dish antenna, 1 no. GPS module, all mounted on a new 7.5m lattice stub mast, with a height to the top of the antennas at 19.0 m above ground level, associated radio units, the relocation of 1 no. existing equipment cabinet and other ancillary works.
-
2021/0506/FUL Granted
The Events And Tents Company Ltd Church Farm Bourne Road Essendine Rutland PE9 4LH
Change of use from B1/B8 to a distillery use including the production of agricultural products grown at Church Farm
-
2025/1161/FUL Granted
18 Manor Farm Lane Essendine Rutland PE9 4LA
Single storey extension to rear and side of the property.
-
2026/0874/CLP Awaiting decision
6 Dunlin Road Essendine Rutland PE9 4UU
Removal of existing conservatory and construction of new single storey flat roofed kitchen/dining extension.
Other full applications applications
In Rutland
-
2026/0715/FUL Granted
Henlopen House Church Road Ketton Rutland PE9 3RD
Provision of new car port.
-
2026/0589/FUL Refused
Land At Rosedene Main Street Thistleton Rutland
Retrospective siting of 7 no. storage containers.
-
2026/0934/FUL Awaiting decision
Grange Farm Ridlington Road Brooke Rutland LE15 8GQ
Section 73A application to retain the mobile home granted approval under reference No 2024/0144/FUL (temporary accommodation) for a further 2 years.
-
2025/1555/FUL Withdrawn
Fox And Hounds Inn 19 The Green Exton Rutland LE15 8AP
Single storey orangery extension and creation of new ground floor terrace to the Fox & Hounds Hotel, Exton
-
2026/0907/FUL Awaiting decision
Adjacent To Co Op Superstore Burley Road Oakham Rutland
Construction of padel tennis facility to provide 3 no. covered padel courts with associated changing and support facilities.