Skip to content
PlanIndex Get alerts
Menu

Planning application

2025/1071/FUL

Maberley 15 High Street Braunston In Rutland Rutland LE15 8QU

Granted Rutland Full Application

Proposal

Car Port and Single Storey side extension.

As published by the council, reference 2025/1071/FUL

Timeline

Dates from the published record

  1. 29 Aug 2025

    Received by Rutland

  2. 23 Oct 2025

    Decision issued: Approve

  3. 20 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2025/1188/FUL Awaiting decision

    Ivy House 13 High Street Braunston In Rutland Rutland LE15 8QU

    Two storey side extension

    12 Sep 2025 39m away Full applications
  • 2025/1204/CAT Granted

    The Headlands 2 Oakham Road Braunston In Rutland Rutland LE15 8QY

    T1 Willow, crown reduce elongated branches by 1-2m as shown on the attached photos, also remove the limb from recent storm damage also shown in attached photo

    22 Sep 2025 71m away Trees
  • 2025/1308/CAT Granted

    The Paddocks 1 Church Street Braunston In Rutland Rutland LE15 8QT

    Fell 2 no. Hawthorn trees (1 and 2), Fell 1 no. Plum tree (3), Fell 1 no. Sycamore tree (4) and Reduce tree 5 in height by 2/3 metres and raise the canopy to 2.5 metres from the ground.

    14 Oct 2025 90m away Trees
  • 2024/1085/CAT Granted

    Otters Holt 6 Oakham Road Braunston In Rutland Rutland LE15 8QY

    Crown raise by 5 Metres 1 No. Norway maple (Acer platanoides). Fell 1 No. Ornamental cherry (Prunus sp.)

    24 Sep 2024 109m away Trees
  • 2025/1701/CLP Granted

    White Shutters 6 Church Street Braunston In Rutland Rutland LE15 8QT

    Replace existing south-facing upper floor bedroom wooden window frame with a new window frame of almost identical size, design and overall geometry.

    30 Dec 2025 112m away Lawful development
  • 2023/0127/CLP Granted

    Barn End High Street Braunston In Rutland Rutland LE15 8QU

    Installation of 22 no. black monocrystalline solar panels on the south slope of the barn roof.

    3 Feb 2023 117m away Lawful development

In Rutland

  • 2026/0715/FUL Granted

    Henlopen House Church Road Ketton Rutland PE9 3RD

    Provision of new car port.

    11 Jun 2026 Full applications
  • 2026/0589/FUL Refused

    Land At Rosedene Main Street Thistleton Rutland

    Retrospective siting of 7 no. storage containers.

    18 May 2026 Full applications
  • 2026/0934/FUL Awaiting decision

    Grange Farm Ridlington Road Brooke Rutland LE15 8GQ

    Section 73A application to retain the mobile home granted approval under reference No 2024/0144/FUL (temporary accommodation) for a further 2 years.

    27 Jul 2026 Full applications
  • 2025/1555/FUL Withdrawn

    Fox And Hounds Inn 19 The Green Exton Rutland LE15 8AP

    Single storey orangery extension and creation of new ground floor terrace to the Fox & Hounds Hotel, Exton

    28 Nov 2025 Full applications
  • 2026/0907/FUL Awaiting decision

    Adjacent To Co Op Superstore Burley Road Oakham Rutland

    Construction of padel tennis facility to provide 3 no. covered padel courts with associated changing and support facilities.

    22 Jul 2026 Full applications