Skip to content
PlanIndex Get alerts
Menu

Planning application

5 Chapel Lane North Luffenham Rutland LE15 8JP

Granted Rutland 2025/0932/FUL Full Application

Works: Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of the existing rear single-storey store. Proposed rooflights. Patio doors removed and existing front double door and new windows in situ. All stained-glass windows to be replaced like for like. Replacement windows. Proposed metal fencing onto existing rear boundary wall. Alterations to the existing front porch. New external double doors in place of existing single door on side elevation.

As published by the council, reference 2025/0932/FUL

Application record

Reference
2025/0932/FUL
Type
Full Application
Status
Decided
Decision
Granted As published: Approve
Received
25 Jul 2025
Validated
25 Jul 2025
Decided
18 Sep 2025
Ward
Normanton Ward
Parish
North Luffenham Parish Council
Decision by
Delegated Decision
Postcode
LE15 8JP

Timeline

Dates from the published record

  1. 25 Jul 2025

    Received by Rutland

  2. 18 Sep 2025

    Decision issued: Approve

  3. 20 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Laura Hayward Architects Agent, an architecture practice registered in Melton Mowbray

Active · incorporated 2025 · Melton Mowbray

22 applications on PlanIndex · across 6 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

The council's own list, drawings first

20 documents on file for this application

Drawings (12)

  • Proposed ground floor plan 29 Jul 2025
  • Proposed first floor plan 29 Jul 2025
  • Proposed elevations 29 Jul 2025
  • Proposed rear wall 29 Jul 2025
  • Block plan 29 Jul 2025
  • Window detail 29 Jul 2025
  • Window detail 29 Jul 2025
  • Existing ground floor plan 29 Jul 2025
  • Existing first floor plan 29 Jul 2025
  • Existing elevations 29 Jul 2025
  • Existing rear wall 29 Jul 2025
  • Existing location plan 29 Jul 2025

Everything on file (20)

  • DECISION NOTICE Decision Notice · 18 Sep 2025
  • CONSULTEE - CONSERVATION OFFICER Representations · 10 Sep 2025
  • OFFICER DELEGATED REPORT Report · 10 Sep 2025
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 29 Jul 2025
  • GROUND FLOOR PLAN Drawing Existing · 29 Jul 2025
  • FIRST FLOOR PLAN Drawing Existing · 29 Jul 2025
  • ELEVATIONS Drawing Existing · 29 Jul 2025
  • REAR WALL Drawing Existing · 29 Jul 2025
  • STATEMENT OF WORKS Supporting Document · 29 Jul 2025
  • WINDOW DETAIL 1 Detail Drawing · 29 Jul 2025
  • WINDOW DETAIL 2 Detail Drawing · 29 Jul 2025
  • LOCATION PLAN Drawing Existing · 29 Jul 2025
  • BLOCK PLAN Drawing Existing/Proposed · 29 Jul 2025
  • HISTORIC ENGLAND ADVICE NOTE Supporting Document · 29 Jul 2025
  • GROUND FLOOR PLAN Drawing Proposed · 29 Jul 2025
  • FIRST FLOOR PLAN Drawing Proposed · 29 Jul 2025
  • ELEVATIONS Drawing Proposed · 29 Jul 2025
  • REAR WALL Drawing Proposed · 29 Jul 2025
  • NOTIFIED NEIGHBOUR LIST Notified Neighbour List · 29 Jul 2025
  • CONSULTEE - FORESTRY OFFICER Representations · 29 Jul 2025

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you the drawings on every job in your area. 14 days free.

What this grant of permission means

Rutland granted permission on 18 September 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Rutland

  • 2026/1089/FUL Granted

    Old Bakehouse Stables 10 Thompsons Lane Seaton Rutland LE15 9JA

    Demolition of existing single storey section and erection of new two storey extension.

    Received 1 Sep, published by the council 24 Sep 2026 Full applications
  • 2026/1420/FUL Awaiting decision

    The Bungalow 43A Aldgate Ketton Rutland PE9 3TD

    Demolition of rear conservatory and side boiler room, erection of single-storey rear and side extension, replacement windows/doors, render external walls, new raised deck, installation of air source heat pump, alterations to internal layout and external hard/soft landscaping.

    Received 17 Nov, published by the council 20 Nov 2026 Full applications
  • 2026/0122/FUL Granted

    Orchard House Main Street Barrow Rutland LE15 7PE

    Two storey rear extension with pitched roof

    Received 30 Jan, published by the council 20 Jul 2026 Full applications
  • 2026/0840/FUL Granted

    Middle Farm Main Street Barrow Rutland LE15 7PE

    Two storey extension.

    Received 3 Jul, published by the council 20 Jul 2026 Full applications
  • 2026/1415/FUL Awaiting decision

    40 Stamford Road Oakham Rutland LE15 6JA

    Section 73 application to vary Condition 2 (Approved Plans) of application 2026/0383/FUL. (Two storey side and rear extension and single storey rear extension. Vehicular timber gates to front. Full property rendering).

    Received 16 Nov, published by the council 18 Nov 2026 Full applications