Planning application
Meadow Edge Burley Road Langham Rutland LE15 7HZ
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Two storey side extension. Gates, piers and stone wall to front.
As published by the council, reference 2023/0253/FUL
Application record
- Reference
- 2023/0253/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 8 Mar 2023
- Validated
- 8 Mar 2023
- Decided
- 16 May 2023
- Ward
- Langham Ward
- Parish
- Langham Parish Council
- Decision by
- Delegated Decision
- Postcode
- LE15 7HZ
Site history
Applications at this address on the Rutland register
This site has had 2 applications since 2022: 1 approved, 0 refused.
-
2022/1435/FUL Withdrawn
Meadow Edge Burley Road Langham Rutland LE15 7HZ
Two storey side extension and rear under cover canopy. Stone wall and gates to front.
Timeline
Dates from the published record
-
8 Mar 2023
Received by Rutland
-
16 May 2023
Decision issued: Approve
-
15 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Rutland Planning Agent, a planning consultancy
164 applications on PlanIndex · across 5 councils · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
The council's own list, drawings first
15 documents on file for this application
Drawings (3)
- Revised proposed and existing floor plans and elevations
- Proposed block plan
- Location plan
Everything on file (15)
- DELEGATED OFFICER REPORT
- DECISION NOTICE
- CONSULTEE - HIGHWAYS
- CONSULTEE - ECOLOGY
- CONSULTEE - LANGHAM PARISH COUNCIL
- REVISED PROPOSED AND EXISTING FLOOR PLANS AND ELEVATIONS
- BAT INFORMATION
- CONSULTEE - HIGHWAYS
- NOTIFIED NEIGHBOUR LIST
- LOCATION PLAN
- BLOCK PLAN
- FLOOR PLANS AND ELEVATIONS
- GABLE WEST END SHOWING BAT BOX
- EXISTING & PROPOSED FLOOR PLANS & ELEVATIONS
- APPLICATION FORM
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What this grant of permission means
Rutland granted permission on 16 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Meadow Edge Burley Road Langham Rutland LE15 7HZ
Two storey side extension and rear under cover canopy. Stone wall and gates to front.
Other full applications
In Rutland
-
2026/1089/FUL Granted
Old Bakehouse Stables 10 Thompsons Lane Seaton Rutland LE15 9JA
Demolition of existing single storey section and erection of new two storey extension.
-
2026/0122/FUL Granted
Orchard House Main Street Barrow Rutland LE15 7PE
Two storey rear extension with pitched roof
-
2026/0840/FUL Granted
Middle Farm Main Street Barrow Rutland LE15 7PE
Two storey extension.
-
2026/1415/FUL Awaiting decision
40 Stamford Road Oakham Rutland LE15 6JA
Section 73 application to vary Condition 2 (Approved Plans) of application 2026/0383/FUL. (Two storey side and rear extension and single storey rear extension. Vehicular timber gates to front. Full property rendering).
-
2026/1407/FUL Awaiting decision
Bloody Oaks Service Station Casterton Road Tickencote Rutland PE9 4AD
Retrospective Installation of an ATM machine