Planning application
26/00338/FULPP
39 Netley Street Farnborough Hampshire GU14 6AH
Proposal
Conversion of garage to habitable accommodation and erection of a single storey rear extension
As published by the council, reference 26/00338/FULPP
Timeline
Dates from the published record
-
22 Jun 2026
Received by Rushmoor
-
27 Jun 2026
Validated
Checked as complete and ready for consideration.
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Rushmoor for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
21/00562/CAT Granted
39 Netley Street Farnborough Hampshire GU14 6AH
Remove one Cherry (T1 on submitted plan), two Conifers (T3 and T4) and one Cherry tree (T5). Coppice one Lilac (T2) and reduce crown of one Cherry tree (T6) by no more than 2 metres. All trees are within the South Farnborough Conservation Area
-
25/00617/FULPP Granted
48 Winchester Street Farnborough Hampshire GU14 6AW
Erection of a single storey wrap around rear extension
-
20/00243/CATPP Granted
48 Winchester Street Farnborough Hampshire GU14 6AW
Eucalyptus tree (T1 on submitted Plan) - remove and replace with an indigenous Malus to complement the existing trees. Tree within South Farnborough Conservation Area.
-
20/00270/CATPP Granted
77 Osborne Road Farnborough Hampshire GU14 6AP
Remove one Sycamore (T1 on submitted plan). One Pine (T2) reduce by no more than 2 metres and remove lowest broken limb. The trees are within the South Farnborough Conservation Area
-
26/00355/CATPP Granted
77 Osborne Road Farnborough Hampshire GU14 6AP
Remove one Pine, T1 on submitted plan. The tree is within the South Farnborough Conservation Area
-
25/00563/FULPP Refused
40 Netley Street Farnborough Hampshire GU14 6AQ
Erection of a single storey rear and side extension following demolition of conservatory and erection of a larger porch canopy
Other full applications applications
In Rushmoor
-
26/00429/FULPP Awaiting decision
27A Woburn Avenue Farnborough Hampshire GU14 7EQ
Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation
-
26/00424/FULPP Awaiting decision
160 Alexandra Road Farnborough Hampshire GU14 6RY
Erection of a two storey rear/side extension
-
26/00420/FULPP Awaiting decision
50 Sidlaws Road Farnborough Hampshire GU14 9JN
Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch
-
26/00417/FULPP Awaiting decision
61 Queensmead Farnborough Hampshire GU14 7RL
External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure