Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00191/FULPP

130 Morland Road Aldershot Hampshire GU11 3SG

Awaiting decision Rushmoor Full App via planning portal

Proposal

Erection of a single storey front extension

As published by the council, reference 26/00191/FULPP

Timeline

Dates from the published record

  1. 11 Apr 2026

    Received by Rushmoor

  2. 20 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Rushmoor for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00195/FULPP Granted

    132 Morland Road Aldershot Hampshire GU11 3SG

    Erection of a single storey front extension and a single storey side and rear extension

    14 Apr 2026 9m away Full applications
  • 26/00155/NMAPP Granted

    108 Morland Road Aldershot Hampshire GU11 3SF

    Non-Material Amendment to 25/00208/FULPP (Demolition of the existing garden room and carport and erection of outbuilding with pergola and formation of block paved driveway with dropped kerb for vehicular access) to allow changes in material and fenestration to the outbuilding

    24 Mar 2026 91m away Amendments
  • 25/00439/FULPP Granted

    4 Bryce Gardens Aldershot Hampshire GU11 3SZ

    Erection of a first floor side extension with two roof lights and erection of a single storey rear extension

    19 Aug 2025 325m away Full applications
  • 21/00505/FULPP Granted

    155 Cadnam Close Aldershot Hampshire GU11 3RN

    Retrospective application for external wall insulated render system to the south flank wall of building (flats 155-160 inc Cadnam Close)

    17 Jun 2021 342m away Full applications
  • 25/00396/FULPP Granted

    Aldershot Lido Guildford Road Aldershot Hampshire GU12 4BP

    Installation of free-standing aluminium-framed canopy structure with integrated solar panel system on roof external in grassed area

    29 Jul 2025 347m away Full applications

In Rushmoor

  • 26/00429/FULPP Awaiting decision

    27A Woburn Avenue Farnborough Hampshire GU14 7EQ

    Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation

    29 Jul 2026 Full applications
  • 26/00424/FULPP Awaiting decision

    160 Alexandra Road Farnborough Hampshire GU14 6RY

    Erection of a two storey rear/side extension

    27 Jul 2026 Full applications
  • 26/00420/FULPP Awaiting decision

    50 Sidlaws Road Farnborough Hampshire GU14 9JN

    Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch

    25 Jul 2026 Full applications
  • 26/00417/FULPP Awaiting decision

    61 Queensmead Farnborough Hampshire GU14 7RL

    External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation

    24 Jul 2026 Full applications
  • 26/00407/FULPP Awaiting decision

    Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF

    Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure

    17 Jul 2026 Full applications