Planning application

26/00148/FULPP

12 Anglesey Road Aldershot Hampshire GU12 4RF

Awaiting decision Rushmoor Full App via planning portal

Proposal

Change of roof material from slate to concrete interlocking tile, change of rear roof dormer pitch

As published by the council, reference 26/00148/FULPP

Timeline

Dates from the published record

  1. 21 Mar 2026

    Received by Rushmoor

  2. 15 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Rushmoor for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 20/00406/HCC Granted

    Alderwood Junior School Newport Road Aldershot Hampshire GU12 4PW

    Installation of a single modular classroom building

    17 Jun 2020 59m away Outline
  • 26/00388/FULPP Awaiting decision

    66 Haig Road Aldershot Hampshire GU12 4PR

    Erection of a single-storey side and rear wrap-around extension following demolition of the existing detached side garage, with external materials to match the existing dwelling.

    7 Jul 2026 120m away Full applications
  • 26/00092/FULPP Granted

    123 Newport Road Aldershot Hampshire GU12 4PY

    Erection of single storey side and rear extension following demolition of existing lean to conservatory

    21 Feb 2026 129m away Full applications
  • 20/00241/FUL Granted

    67 Newport Road Aldershot Hampshire GU12 4PW

    Erection of a part single and two storey rear extension

    6 Apr 2020 189m away Full applications
  • 26/00150/PDCPP Decided

    4 Wilson Road Aldershot Hampshire GU12 4QZ

    LAWFUL DEVELOPMENT CERTIFICATE FOR PROPOSED DEVELOPMENT: Erection of a single storey rear extension

    23 Mar 2026 194m away Outline
  • 26/00069/REXPD Withdrawn

    4 Wilson Road Aldershot Hampshire GU12 4QZ

    Erection of a single-storey rear extension measuring 6 metres deep by 2.45 metres to the eaves by 2.7 metres overall height

    12 Feb 2026 194m away Prior approval

In Rushmoor

  • 26/00429/FULPP Awaiting decision

    27A Woburn Avenue Farnborough Hampshire GU14 7EQ

    Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation

    29 Jul 2026 Full applications
  • 26/00424/FULPP Awaiting decision

    160 Alexandra Road Farnborough Hampshire GU14 6RY

    Erection of a two storey rear/side extension

    27 Jul 2026 Full applications
  • 26/00420/FULPP Awaiting decision

    50 Sidlaws Road Farnborough Hampshire GU14 9JN

    Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch

    25 Jul 2026 Full applications
  • 26/00417/FULPP Awaiting decision

    61 Queensmead Farnborough Hampshire GU14 7RL

    External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation

    24 Jul 2026 Full applications
  • 26/00407/FULPP Awaiting decision

    Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF

    Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure

    17 Jul 2026 Full applications