Planning application
25/00576/FULPP
13 Ashley Road Farnborough Hampshire GU14 7EZ
Proposal
Erection of a single storey rear extension to facilitate conversion of existing garage to living accommodation
As published by the council, reference 25/00576/FULPP
Timeline
Dates from the published record
-
22 Oct 2025
Received by Rushmoor
-
31 Oct 2025
Validated
Checked as complete and ready for consideration.
-
22 Dec 2025
Decision issued: Permission Granted
-
26 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00341/REVPP Awaiting decision
9 Ashley Road Farnborough Hampshire GU14 7EZ
Removal of condition 4 of planning permission 24/00492/FULPP 'Conversion of existing garage and erection of a single storey front extension and a part single and two storey side extension' dated 9th October 2024 to allow the change of materials to thermo wood cladding and the colour 'Linen' render on the front elevation
-
23/00086/TPO Granted
7 Ashley Road Farnborough Hampshire GU14 7EZ
Two Limes (part of group G10 of TPO 431V) T1 and T2 on submitted plan, re-pollard back to previous pollard points
-
20/00348/FULPP Granted
26 Ashley Road Farnborough Hampshire GU14 7HA
Erection of new pergola with privacy screens and raised decking to the rear
-
21/00360/FULPP Granted
Highcliffe 11 Waverley Road Farnborough Hampshire GU14 7EY
Erection of a part two storey and single storey rear extension, formation of dormer within existing rear facing roof slope and single storey infill extension to front
-
26/00088/FULPP Granted
30 Avenue Road Farnborough Hampshire GU14 7BL
Erection of an outbuilding to the rear
-
20/00306/TPOPP Granted
33 Ashley Road Farnborough Hampshire GU14 7EZ
One Oak (part of group G16 of TPO 431A photo attached) remove lowest two branches. One Holly Tree (part of group G16 of TPO 431A photo attached) remove 4 smaller trunks that are leaning at an angle leaving two main trunks. All trees within the boundaries of 33 Ashley Road that are included in TPO 431A groups G14 and G16 (document attached) remove lower branches to raise canopies to no more than 4 metres from ground level
Other full applications applications
In Rushmoor
-
26/00429/FULPP Awaiting decision
27A Woburn Avenue Farnborough Hampshire GU14 7EQ
Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation
-
26/00424/FULPP Awaiting decision
160 Alexandra Road Farnborough Hampshire GU14 6RY
Erection of a two storey rear/side extension
-
26/00420/FULPP Awaiting decision
50 Sidlaws Road Farnborough Hampshire GU14 9JN
Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch
-
26/00417/FULPP Awaiting decision
61 Queensmead Farnborough Hampshire GU14 7RL
External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure