Planning application
25/00457/FULPP
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Proposal
Installation of 6no. Electric Vehicle Parking Bays and associated works
As published by the council, reference 25/00457/FULPP
Timeline
Dates from the published record
-
1 Sep 2025
Received by Rushmoor
-
26 Sep 2025
Validated
Checked as complete and ready for consideration.
-
27 Jan 2026
Decision issued: Application Withdrawn
-
26 Jul 2026
Added to PlanIndex
What withdrawal means
The process from here
The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.
The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure
-
26/00139/PDCPP Withdrawn
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
CERTIFICATE OF LAWFULNESS FOR A PROPOSED USE OR DEVELOPMENT: 6no. Electric Vehicle charging bays, 3no. EV Charging Posts and associated electric equipment
-
26/00142/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Erection of an LV switchgear pillar box
-
25/00505/CONDPP Granted
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Submission of details pursuant to Condition No.14 (30-Year Habitat Management and Monitoring Plan) of planning permission 24/00441/FULPP dated 1st August 2025
-
25/00469/CONDPP Granted
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Submission of details pursuant to Condition Nos.5 (Surface Water Drainage Scheme details) of planning permission 24/00441/FULPP dated 1st August 2025
-
25/00468/CONDPP Granted
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Submission of details pursuant to Condition Nos. 3 (External Finishes Schedule) and 11 (Construction & Environmental Management Plan) of planning permission 24/00441/FULPP dated 1st August 2025
Other full applications applications
In Rushmoor
-
26/00429/FULPP Awaiting decision
27A Woburn Avenue Farnborough Hampshire GU14 7EQ
Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation
-
26/00424/FULPP Awaiting decision
160 Alexandra Road Farnborough Hampshire GU14 6RY
Erection of a two storey rear/side extension
-
26/00420/FULPP Awaiting decision
50 Sidlaws Road Farnborough Hampshire GU14 9JN
Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch
-
26/00417/FULPP Awaiting decision
61 Queensmead Farnborough Hampshire GU14 7RL
External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure