Planning application
24/00596/FULPP
Bankside 76 Salisbury Road Farnborough Hampshire GU14 7AG
Proposal
Erection of rendered pillars and iron entrance gates
As published by the council, reference 24/00596/FULPP
Timeline
Dates from the published record
-
28 Sep 2024
Received by Rushmoor
-
15 Nov 2024
Decision issued: Permission Granted
-
28 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
23/00083/TPOPP Granted
26 Church Avenue Farnborough Hampshire GU14 7AT
One Ash (T24 of TPO 433V) T1 on submitted plan, crown raise by no more than 5 metres from ground level, third order branching only, branches overhanging boundary with 28 Church Avenue only
-
25/00574/TPOPP Granted
11 Church Avenue Farnborough Hampshire GU14 7AY
T1 and T2 Beech on submitted plan (part of group G4 of TPO 435V) crown reduction by no more than 3 metres overall. Lift crown to no more than 6 metres from ground level. T3 Beech (part of group G5 of TPO 435V) crown reduction by no more than 3 metres overall. T4 Sweet Chestnut (T9 of TPO 435V) crown reduction by no more than 2 metres
-
23/00130/TPOPP Granted
57 Salisbury Road Farnborough Hampshire GU14 7AG
Remove to ground level and replace one declining Oak (part of group G7 of TPO 433V) tree T1 in submitted report
-
26/00212/MISC28 Granted
The Birches 5 Church Avenue Farnborough Hampshire GU14 7AY
The Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) - Regulation 5 Notice of Intention to Install Fixed Line Broadband Apparatus - Erection of 10m high wooden pole
-
26/00109/TPOPP Granted
89 Salisbury Road Farnborough Hampshire GU14 7AE
One Beech ( T14 of TPO 435V) T1 on submitted plan, crown reduce by no more than 4 metres back to previous reduction points and thin canopy by no more than 20%
-
25/00421/TPOPP Awaiting decision
166 Farnborough Road Farnborough Hampshire GU14 7JJ
Remove to ground level one Silver Birch T1 on submitted plan (T36 of TPO 433V)
Other full applications applications
In Rushmoor
-
26/00429/FULPP Awaiting decision
27A Woburn Avenue Farnborough Hampshire GU14 7EQ
Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation
-
26/00424/FULPP Awaiting decision
160 Alexandra Road Farnborough Hampshire GU14 6RY
Erection of a two storey rear/side extension
-
26/00420/FULPP Awaiting decision
50 Sidlaws Road Farnborough Hampshire GU14 9JN
Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch
-
26/00417/FULPP Awaiting decision
61 Queensmead Farnborough Hampshire GU14 7RL
External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure