Proposal

Erection of a single storey side extension and changes to fenestration

As published by the council, reference 24/00422/FULPP

Timeline

Dates from the published record

  1. 16 Jul 2024

    Received by Rushmoor

  2. 6 Nov 2024

    Decision issued: Permission Granted

  3. 28 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00290/PDCPP Awaiting decision

    2 Beechnut Road Aldershot Hampshire GU12 4JG

    CERTIFICATE OF LAWFULNESS FOR A PROPOSED DEVELOPMENT: Proposed single storey rear extensions

    28 May 2026 11m away Outline
  • 26/00389/REV Awaiting decision

    245 - 247 High Street Aldershot Hampshire

    Variation of condition 2 (approved drawings) of permission 24/00014/FULPP dated 10.10.2024 for a roof extension including new pitched roof over no. 245, new rear roof dormers, first floor rear extensions and change of use of existing first floor flat into office use (E Commercial Use Class), to allow for changes to rear extension

    7 Jul 2026 40m away Amendments
  • 20/00284/PDCPP Decided

    Kalathea 1B St Michaels Road Aldershot Hampshire GU12 4JF

    Lawful Development Certificate: Erection of single storey rear extension demolition of existing conservatory

    30 Apr 2020 45m away Outline
  • 25/00546/FUL Awaiting decision

    250A High Street Aldershot Hampshire GU12 4LP

    Erection of a second floor rear extension

    10 Oct 2025 84m away Full applications
  • 25/00417/FULPP Granted

    18 St Michaels Road Aldershot Hampshire GU12 4JE

    Proposed single storey side and rear extension

    1 Aug 2025 98m away Full applications
  • 26/00111/FULPP Awaiting decision

    Storage Land East Station Road Aldershot Hampshire

    Change of use from nil-use to mixed commercial, retail and storage use (sui generis), and associated retention of mobile structures and generator (Retrospective)

    4 Mar 2026 188m away Full applications

In Rushmoor

  • 26/00429/FULPP Awaiting decision

    27A Woburn Avenue Farnborough Hampshire GU14 7EQ

    Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation

    29 Jul 2026 Full applications
  • 26/00424/FULPP Awaiting decision

    160 Alexandra Road Farnborough Hampshire GU14 6RY

    Erection of a two storey rear/side extension

    27 Jul 2026 Full applications
  • 26/00420/FULPP Awaiting decision

    50 Sidlaws Road Farnborough Hampshire GU14 9JN

    Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch

    25 Jul 2026 Full applications
  • 26/00417/FULPP Awaiting decision

    61 Queensmead Farnborough Hampshire GU14 7RL

    External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation

    24 Jul 2026 Full applications
  • 26/00407/FULPP Awaiting decision

    Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF

    Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure

    17 Jul 2026 Full applications