Planning application
24/00187/FULPP
Blackwater River Bridge The Hatches Farnborough Hampshire
Proposal
Demolition of existing concrete and timber pedestrian bridge, replacement with pre cast concrete pedestrian and vehicular bridge approx 3 metres to the south. Construction of bridge will involve the use of temporary portadams and a temporary worksite to the south west. An existing vehicular track will be resurfaced from the bridge for a 1km south to Coleford Bridge roundabout
As published by the council, reference 24/00187/FULPP
Timeline
Dates from the published record
-
20 Mar 2024
Received by Rushmoor
-
28 Mar 2024
Validated
Checked as complete and ready for consideration.
-
22 Nov 2024
Decision issued: Application Withdrawn
-
1 Aug 2026
Added to PlanIndex
What withdrawal means
The process from here
The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.
The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/00501/MISC28 Granted
Telecommunication Mast Vodafone 77717 Farnborough Street Farnborough Hampshire GU14 8AQ
(Re-submission of 25/00376/MISC28 due to different positioning of cabinets ) Notification under the Electronic Communications Code (Conditions and Restrictions) Regulations 2003 (As Amended) to utilise Permitted Development Rights: The removal of the existing 15.5m Hutchinson Mini Macro monopole and replacing it with a new 20m Hutchinson M-Range monopole on a new root. The removal of existing 6No. Antennas to be replaced with 6No. Antennas and any other associated ancillary works thereto. The installation of 1No. 300mm dish at 14.70m.The removal of 3No. Cabinets to be replaced with 2No. Cabinets
-
23/00176/PRIOR Withdrawn
Proposed Footbridge Farnborough North Station Farnborough Street Farnborough Hampshire
Construction of footbridge and two lift shafts
-
26/00106/FULPP Granted
Station Yard Farnborough Street Farnborough Hampshire GU14 8AQ
Erection of 2.4m boundary fencing to replace existing 1.8m fence
-
23/00139/FULPP Granted
3 Home Farm Close Farnborough Hampshire GU14 8BU
Installation of solar panels to front roof slope
-
26/00153/NMAPP Granted
4 Ship Lane Farnborough Hampshire GU14 8BX
NON MATERIAL AMENDMENT: To application 21/00100/FULPP (erection of a single storey side extension, formation of dormer windows to side elevations, extension of existing garage at the rear to form a store room and replace garage roof and erection of a 2 metres boundary fence to front) to allow for the side dormer to be widened and dormer soffits and fascias to be reduced
-
21/00530/CAT Granted
Empress Cottage 5 Ship Lane Farnborough Hampshire GU14 8BX
Remove one conifer on boundary with 3 Ship Lane. The tree is within the Farnborough Hill Conservation Area
Other full applications applications
In Rushmoor
-
26/00429/FULPP Awaiting decision
27A Woburn Avenue Farnborough Hampshire GU14 7EQ
Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation
-
26/00424/FULPP Awaiting decision
160 Alexandra Road Farnborough Hampshire GU14 6RY
Erection of a two storey rear/side extension
-
26/00420/FULPP Awaiting decision
50 Sidlaws Road Farnborough Hampshire GU14 9JN
Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch
-
26/00417/FULPP Awaiting decision
61 Queensmead Farnborough Hampshire GU14 7RL
External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure