Skip to content
PlanIndex Get alerts
Menu

Planning application

23/00090/FULPP

93 Peabody Road Farnborough Hampshire GU14 6EB

Granted Rushmoor Full App via planning portal

Proposal

Erection of infill roof extension within in valley between Nos.91 & 93 Peabody Road to create additional bedrooms and ancillary accommodation for No.93

As published by the council, reference 23/00090/FULPP

Timeline

Dates from the published record

  1. 31 Jan 2023

    Received by Rushmoor

  2. 27 Mar 2023

    Decision issued: Permission Granted

  3. 28 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 23/00096/FUL Granted

    93 Peabody Road Farnborough Hampshire GU14 6EB

    Demolition of existing temporary structure in rear garden and erection of new outbuilding of reduced height in same position for ancillary domestic storage

    1 Feb 2023 11m away Full applications
  • 26/00114/FULPP Refused

    13 Sherborne Road Farnborough Hampshire GU14 6JS

    Raising of the ridge and formation of two side facing dormer windows to facilitate rooms in roof

    6 Mar 2026 106m away Full applications
  • 20/00381/REV Granted

    43 Reading Road Farnborough Hampshire GU14 6UG

    Relief of condition 13 of planning permission RSH 1372/3 dated 31.01.84 to allow the conversion of garage to form a habitable room

    9 Jun 2020 184m away Amendments
  • 21/00294/FULPP Granted

    85 Queens Road Farnborough Hampshire GU14 6JW

    Single Storey Rear Extension

    14 Apr 2021 216m away Full applications
  • 25/00606/FULPP Awaiting decision

    63 Cambridge Road East Farnborough Hampshire GU14 6QX

    Erection of a bungalow to the rear of 63 Cambridge Road East with access from Minster Close

    10 Nov 2025 261m away Full applications
  • 25/00413/FULPP Withdrawn

    46 Camp Road Farnborough Hampshire GU14 6EP

    Internal alterations to convert rear of existing commercial into 1no self-contained studio unit

    30 Jul 2025 277m away Full applications

In Rushmoor

  • 26/00429/FULPP Awaiting decision

    27A Woburn Avenue Farnborough Hampshire GU14 7EQ

    Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation

    29 Jul 2026 Full applications
  • 26/00424/FULPP Awaiting decision

    160 Alexandra Road Farnborough Hampshire GU14 6RY

    Erection of a two storey rear/side extension

    27 Jul 2026 Full applications
  • 26/00420/FULPP Awaiting decision

    50 Sidlaws Road Farnborough Hampshire GU14 9JN

    Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch

    25 Jul 2026 Full applications
  • 26/00417/FULPP Awaiting decision

    61 Queensmead Farnborough Hampshire GU14 7RL

    External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation

    24 Jul 2026 Full applications
  • 26/00407/FULPP Awaiting decision

    Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF

    Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure

    17 Jul 2026 Full applications