Planning application
23/00055/FULPP
27 Church Road East Farnborough Hampshire GU14 6QJ
Proposal
Retention of boundary fencing and electric gates to front boundary
As published by the council, reference 23/00055/FULPP
Timeline
Dates from the published record
-
18 Jan 2023
Received by Rushmoor
-
16 Mar 2023
Decision issued: Permission Refused
-
28 Jul 2026
Added to PlanIndex
What refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
20/00361/PDCPP Decided
1 Canterbury Walk Farnborough Hampshire GU14 6GY
Lawful Development Certificate For Proposed Development: Formation of a dormer within rear facing slope and roof lights within front facing roof slope to facilitate loft conversion
-
21/00472/FULPP Granted
33 Canterbury Road Farnborough Hampshire GU14 6QP
Retention of brick wall and installation of metal railing gates on front boundary
-
26/00012/TPOPP Split decision
73 Albert Road Farnborough Hampshire GU14 6SL
One Oak tree ( part of group G28 of TPO 439V) as per submitted photographs, overall crown reduction of no more than 5 metres and canopy lift to give no more than 6 metres clearance from ground level
-
26/00102/TPOPP Withdrawn
Farley Court Church Road East Farnborough Hampshire GU14 6PZ
One Beech (part of group G38 of TPO 439V) reduce branches of tree in the submitted photographs, by no more than 3 metres to create clearance from building
-
25/00688/FULPP Awaiting decision
Devereux House 69 Albert Road Farnborough Hampshire GU14 6SL
Demolition of existing building, excluding the original façade to Devereux House which is to be retained, and construction of part two/three storey building with accommodation in the roof space to provide a care home (Use Class C2) together with parking, landscaping and associated development.
-
26/00064/TPO Split decision
90 Cambridge Road East Farnborough Hampshire GU14 6QX
Re-pollard one Horse Chestnut tree at front of property (T1 of TPO 397V) to previous points. Remove one Pine tree to rear (T30 of TPO 397V). Remove one Sycamore to rear (T31 of TPO 397V)
Other full applications applications
In Rushmoor
-
26/00429/FULPP Awaiting decision
27A Woburn Avenue Farnborough Hampshire GU14 7EQ
Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation
-
26/00424/FULPP Awaiting decision
160 Alexandra Road Farnborough Hampshire GU14 6RY
Erection of a two storey rear/side extension
-
26/00420/FULPP Awaiting decision
50 Sidlaws Road Farnborough Hampshire GU14 9JN
Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch
-
26/00417/FULPP Awaiting decision
61 Queensmead Farnborough Hampshire GU14 7RL
External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure