Planning application
20/00368/FUL
13 Cabrol Road Farnborough Hampshire GU14 8NY
Proposal
Retention of a two storey side extension, part single and part two storey rear extension and single story front extension (variation of approved planning permission 19/00872/FULPP dated 10th January 2020 to allow a change in window design), and retention of a conservatory and barbeque/chimney in rear garden
As published by the council, reference 20/00368/FUL
Timeline
Dates from the published record
-
4 Jun 2020
Received by Rushmoor
-
25 Jun 2020
Validated
Checked as complete and ready for consideration.
-
4 Aug 2020
Decision issued: Permission Granted
-
28 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/00449/FULPP Granted
Menevia 79 Prospect Road Farnborough Hampshire GU14 8NT
Erection of a part single and part two storey rear extension, entrance canopy to front elevation, new anthracite grey windows, render and timber cladding to the external walls
-
25/00649/NMAPP Granted
14 Cabrol Road Farnborough Hampshire GU14 8NY
NON MATERIAL AMENDMENT: To application 22/00084/FULPP (for single storey side and rear extension and conversion of garage to residential annexe) to allow for change in roof tiles & change heights of side extension
-
26/00138/TPOPP Granted
81 Pierrefondes Avenue Farnborough Hampshire GU14 8NZ
Remove one declining Silver Birch to rear T1 on submitted plan (T30 of TPO 368V)
-
25/00548/FULPP Granted
96 Prospect Road Farnborough Hampshire GU14 8NS
Erection of single storey rear extension with insertion of dormer window and 2 no. roof lights to rear
-
23/00060/FULPP Granted
26 Chestnut Road Farnborough Hampshire GU14 8LD
Erection of a single storey rear extension, front extension and conversion of existing garage and formation of a pitched roof above existing flat roofs on front elevation of property
-
24/00600/FUL Granted
26 Chestnut Road Farnborough Hampshire GU14 8LD
Variation to planning permission Ref: 23/00560/FUL dated 25 August 2023 to change external finishing materials from brick to render and changes to fenestration
Other full applications applications
In Rushmoor
-
26/00429/FULPP Awaiting decision
27A Woburn Avenue Farnborough Hampshire GU14 7EQ
Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation
-
26/00424/FULPP Awaiting decision
160 Alexandra Road Farnborough Hampshire GU14 6RY
Erection of a two storey rear/side extension
-
26/00420/FULPP Awaiting decision
50 Sidlaws Road Farnborough Hampshire GU14 9JN
Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch
-
26/00417/FULPP Awaiting decision
61 Queensmead Farnborough Hampshire GU14 7RL
External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure