Planning application
20/00293/FULPP
Ascent 1 1 Aerospace Boulevard Farnborough Hampshire GU14 6XW
Proposal
Erection of 1no. single storey cafe building constructed using 3no. shipping containers within the car park to the west of Ascent 01 building and associated soft/hard landscaping for a period of 2 years
As published by the council, reference 20/00293/FULPP
Timeline
Dates from the published record
-
5 May 2020
Received by Rushmoor
-
18 May 2020
Validated
Checked as complete and ready for consideration.
-
13 Jul 2020
Decision issued: Permission Granted
-
28 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00182/FULPP Awaiting decision
Warwick House Lakeside Road Farnborough Hampshire GU14 6XP
Redevelopment of the site for employment buildings within Use Classes E(g), B2 and B8, service yards, parking, vehicular and pedestrian access, landscaping, and associated works
-
25/00554/DEMOPP Granted
Warwick House Lakeside Road Farnborough Hampshire GU14 6XP
Application for Prior Approval : Demolition of Warwick House
-
26/00181/FULPP Awaiting decision
Site Of Former Zurich House 1 Gladiator Way Farnborough Hampshire
Redevelopment of the site for employment buildings within Use Classes E(g), B2 and B8, service yards, parking, vehicular and pedestrian access, landscaping, and associated works
-
25/00557/DEMOPP Granted
Zurich House 1 Gladiator Way Farnborough Hampshire GU14 6YY
Application for Prior Approval : Demolition of Geneva House
-
25/00492/FULPP Awaiting decision
Army Golf Club Laffans Road Aldershot Hampshire GU11 2HF
Proposed new water storage lake and associated fence and landscaping
-
25/00630/MISC28 Granted
Telecommunication Mast Vodafone 76788 Cody Technology Park Ively Road Farnborough Hampshire GU14 0LX
NOTIFICATION UNDER THE ELECTRONIC COMMUNICATIONS CODE (CONDITIONS AND RESTRICTIONS) REGULATIONS 2003 (AS AMENDED) TO UTILISE PERMITTED DEVELOPMENT RIGHTS AT CODY TECHNOLOGY PARK - Removal of 3no existing antennas. Installation of 3no new antennas, Installation of 1no new 300mm dish and other associated ancillary development
Other full applications applications
In Rushmoor
-
26/00429/FULPP Awaiting decision
27A Woburn Avenue Farnborough Hampshire GU14 7EQ
Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation
-
26/00424/FULPP Awaiting decision
160 Alexandra Road Farnborough Hampshire GU14 6RY
Erection of a two storey rear/side extension
-
26/00420/FULPP Awaiting decision
50 Sidlaws Road Farnborough Hampshire GU14 9JN
Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch
-
26/00417/FULPP Awaiting decision
61 Queensmead Farnborough Hampshire GU14 7RL
External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure