Planning application
20/00291/FULPP
18 Melrose Close Farnborough Hampshire GU14 9US
Proposal
Retention of dormer to rear roof slope and 3 roof lights to the front roof slope
As published by the council, reference 20/00291/FULPP
Timeline
Dates from the published record
-
5 May 2020
Received by Rushmoor
-
5 Jun 2020
Decision issued: Permission Granted
-
28 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00221/FULPP Awaiting decision
4 Melrose Close Farnborough Hampshire GU14 9US
Erection of single-storey rear and side extensions, and loft conversion including the erection of a rear dormer and installation of two front rooflights
-
26/00328/REVPP Awaiting decision
4 Melrose Close Farnborough Hampshire GU14 9US
Variation of condition 2 of planning permission 26/00221/FULPP 'Erection of single-storey rear and side extensions, and loft conversion alteration to the ground floor side extension including the erection of a rear dormer and installation of two front rooflights dated 11th June 2026 to allow an amendment to the plans to enlargement the width of the approved side extension
-
20/00325/FULPP Granted
Mizpah Trunk Road Farnborough Hampshire GU14 9SW
Erection of a single storey rear extension following removal of existing conservatory
-
25/00670/REVPP Granted
22 Limes Road Farnborough Hampshire GU14 9TS
Variation of Condition 3 of planning permission 20/00003/FULPP dated 31/03/2020 (Alterations and extension to garage for use as Baby Swimming (Use Class D2)) to allow commercial use of pool between 9 am-6 pm Monday to Friday, and 10 am-4 pm on Saturday
-
23/00125/TPOPP Granted
7 Harvey Road Farnborough Hampshire GU14 9TN
5 Oak trees in the front garden ( T1-T5 of TPO 268) crown reduce by no more than 4 metres off the top and no more than 2 metres off the side (lower branches), removal of dead wood and removal of all lower epicormic growth
-
26/00073/TPOPP Granted
62 Harvey Road Farnborough Hampshire GU14 9TW
One Oak T1 on submitted plan (part of group G4 of TPO 261V) crown reduction of no more than 2 metres on higher crown and radial spread and crown lift to no more than 5 metres from ground level
Other full applications applications
In Rushmoor
-
26/00429/FULPP Awaiting decision
27A Woburn Avenue Farnborough Hampshire GU14 7EQ
Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation
-
26/00424/FULPP Awaiting decision
160 Alexandra Road Farnborough Hampshire GU14 6RY
Erection of a two storey rear/side extension
-
26/00420/FULPP Awaiting decision
50 Sidlaws Road Farnborough Hampshire GU14 9JN
Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch
-
26/00417/FULPP Awaiting decision
61 Queensmead Farnborough Hampshire GU14 7RL
External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure