Planning application
20/00175/FUL
St Peters Church Of England Junior School Church Avenue Farnborough Hampshire GU14 7AP
Proposal
Erection of 5 X 5 metre hexagonal timber pavilion and 2.4 X 2.4 metre timber summer house to rear of School; and a 5 X 3 metre metal cycle shelter adjoining sports pitch
As published by the council, reference 20/00175/FUL
Timeline
Dates from the published record
-
6 Mar 2020
Received by Rushmoor
-
18 Mar 2020
Validated
Checked as complete and ready for consideration.
-
5 Jun 2020
Decision issued: Permission Granted
-
28 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00020/TPOPP Granted
56 Church Avenue Farnborough Hampshire GU14 7AP
Crown reduction of T70 Beech of 00429V/ORDER- This is to aid the retention of the tree by reducing the risk of structural failure of the branch unions and to reduce the wind loading and leverage affecting the retaining wall and causing its deterioration
-
26/00274/FULPP Awaiting decision
56 Church Avenue Farnborough Hampshire GU14 7AP
Erection of a first-floor extension over existing garage, conversion of garage to utility and store room, erection of a two-storey front extension, single storey side extension, and part single and part two storey rear extension with patio and steps leading to the rear garden. Render first floor of the external walls and replace windows with grey UPVC/Aluminium
-
24/00622/TPOPP Granted
St Peters Church Of England Junior School Church Avenue Farnborough Hampshire GU14 7AP
One Sycamore (T2 of TPO 298) reduce height of tree by no more than 5 metres and reduce laterals on northern side of tree by no more than 3 metres to rebalance crown
-
26/00087/TPOPP Refused
54 Church Avenue Farnborough Hampshire GU14 7AP
Remove three Sycamore trees and replace (all part of group G6 of TPO 429V)
-
20/00277/HCC Granted
St Peters Church Of England Junior School Church Avenue Farnborough Hampshire GU14 7AP
CONSULTATION FROM HAMPSHIRE COUNTY COUNCIL : LISTED BUILDING CONSENT : internal strengthening and structural repairs to roof of Caretakers' store building
-
25/00452/FULPP Awaiting decision
52 Church Avenue Farnborough Hampshire GU14 7AP
Erection of two-storey rear and side extension following demolition of side garage (revised application from 23/00065/FULPP) and 1.5m high front boundary wall
Other full applications applications
In Rushmoor
-
26/00429/FULPP Awaiting decision
27A Woburn Avenue Farnborough Hampshire GU14 7EQ
Proposed conversion of the existing integral garage into habitable accommodation, erection of a first-floor extension over the existing garage, and extension of the front garage wall by approximately 1.15m to facilitate the first-floor accommodation
-
26/00424/FULPP Awaiting decision
160 Alexandra Road Farnborough Hampshire GU14 6RY
Erection of a two storey rear/side extension
-
26/00420/FULPP Awaiting decision
50 Sidlaws Road Farnborough Hampshire GU14 9JN
Erection of a single storey side and rear extension, convert garage to habitable accommodation and new pitched roof over porch
-
26/00417/FULPP Awaiting decision
61 Queensmead Farnborough Hampshire GU14 7RL
External alterations including replacement of existing windows and insertion of new windows in front, side and rear elevations and insertion of new door in front elevation
-
26/00407/FULPP Awaiting decision
Village Hotel Pinehurst Road Farnborough Hampshire GU14 7BF
Installation of an EV charging hub comprising electrical upstands, a substation, an LV switchgear pillar, line markings and associated electrical infrastructure