Planning application
Toot Hill Comprehensive School The Banks Bingham Nottinghamshire NG13 8BL
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Redevelopment of Toot Hill School, including demolition of majority of existing buildings and construction of new accommodation across two three storey teaching and sports blocks, as well as reconfigured access and parking, new and enhanced landscaping, installation of sub-stations, relocation and replacement of MUGA facilities and the diversion and enhancement of Public Right of Way FP15.
As published by the council, reference 26/01009/FUL
Application record
- Reference
- 26/01009/FUL
- Type
- Full Application
- Received
- 11 Jun 2026
- Validated
- 16 Jun 2026
- Ward
- Bingham South
- Parish
- Bingham
- Decision by
- Delegated
- Postcode
- NG13 8BL
Site history
Applications at this address on the Rushcliffe register
This site has had 2 applications since 2026.
-
26/00614/SCREIA Decided
Toot Hill Comprehensive School The Banks Bingham Nottinghamshire NG13 8BL
Request for an Environmental Impact Assessment Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 pertains to the forthcoming full planning application for the redevelopment of Toot Hill School.
Timeline
Dates from the published record
-
11 Jun 2026
Received by Rushcliffe
-
16 Jun 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
8 Aug 2026
Status changed to Pending Decision
-
Decision
Awaiting decision
Decision expected by 11 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Rushcliffe took a median of 74 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
224 documents on file for this application
- DRAFT BIODIVERSITY GAIN PLAN
- ECOLOGICAL ENHANCEMENT PLAN
- ECOLOGICAL IMPACT ASSESSMENT
- HMMP
- SCHOOL TRAVEL PLAN
- EXISTING SITE PLAN
- WHOLE SITE PLAN
- TREE REMOVAL, PROTECTION, & RETENTION PLAN
- ACCESS AND SECURITY FENCING OVERVIEW
- ACCESS AND SECURITY CIRCULATION OVERVIEW
- SITE SECTIONS 1 OF 3
- SITE SECTIONS 2 OF 3
- SITE SECTIONS 3 OF 3
- SITE DEMOLITION PLAN
- BUILDING PROXIMITY PLAN
- SPORT FACILITY ACCESS PLAN
- EXISTING SPORTS PROVISION
- PROPOSED SPORTS PROVISION
- PROW STATEMENT APP 4 SECTIONS
- PROW DETAILED LANDSCAPING PLAN 1 OF 3
- SITE LOCATION PLAN
- PROW STATEMENT APP 3 PROW DIVERSION PLAN
- SITE LANDSCAPING PLAN OVERVIEW
- PLANTING STRATEGY
- PROW DETAILED LANDSCAPING PLAN 3 OF 3
- PROW DETAILED LANDSCAPING PLAN 2 OF 3
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- NCC HIGHWAYS TRAVEL PLAN
- I CRAIG 38 THE BANKS, BINGHAM
- RESPONSES TO OUTSTANDING ISSUES AND CONSULTEE COMMENTS
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- EXTERNAL LIGHTING PLAN
- AGENT RESPONSE TO NEIGHBOUR COMMENTS
- CLEANING AND MAINTENANCE STRATEGY
- PROW DIVERSION SCOPE OF WORKS
- ACCESS AND SECURITY FENCING OVERVIEW
- PROPOSED SPORTS PROVISION
- PROW DETAILED LANDSCAPING PLAN 1 OF 3
- EXTERNAL LIGHTING TECHNICAL SUBMISSION
- EXTERNAL LIGHTING CALCULATIONS
- SUPPLEMENTARY GROUND INVESTIGATION REPORT
- ON SITE CONTRACTOR PARKING OPTIONS
- TRANSPORT ASSESSMENT ADDENDUM NOTE
- CEMP APP B SITE LOGISTICS PLAN
- COMMUNITY USE SCHEDULE AND SPORTS CONTINUITY PLAN
- SPORT FACILITY ACCESS PLAN
- EXISTING SPORTS PROVISION
- PROW STATEMENT APP 3 PROW DIVERSION PLAN
- PROW DETAILED LANDSCAPING PLAN 2 OF 3
- PROW DETAILED LANDSCAPING PLAN 3 OF 3
- I CRAIG 38 THE BANKS, BINGHAM
- SPORT ENGLAND
- LETTER TO SECRETARY OF STATE
- CONSERVATION
- IAN CRAIG
- ACTIVE TRAVEL ENGLAND
- IAN CRAIG
- MR PUBLIC RIGHTS OF WAY NCC
- NCC HIGHWAYS
- NATIONAL HIGHWAYS
- MR TED BIRCH
- AGENT RESPONSE TO SPORT ENGLAND
- MUGA INFORMATION
- NCC HIGHWAYS
- NCC FLOOD RISK
- RBC COMMUNITIES TEAM
- NCC FLOOD RISK
- ENVIRONMENTAL HEALTH
- NCC FLOOD RISK
- MR ENVIRONMENTAL HEALTH
- MR AND MRS PETER SAVAGE
- AGENT AND LLFA COMMUNICATION
- AGENT RESPONSE TO BINGHAM TOWN COUNCIL
- NCC PLANNING
- NOTTS AREA RAMBLERS
- COUNCILLOR GARETH WILLIAMS
- PROW DIVERSION SCOPE OF WORKS
- MS TOWN CLERK
- ACTIVE TRAVEL ENGLAND
- MRS DEBBIE SOLOMAN
- J BARNES PHOTOS
- MR IAN CRAIG 38 THE BANKS BINGHAM NG13 8BT
- SPORT ENGLAND
- NATIONAL HIGHWAYS
- SENIOR DESIGN AND LANDSCAPE OFFICER
- IAN CRAIG
- NCC FLOOD RISK
- HISTORIC ENGLAND
- ARCHAEOLOGICAL ADVISOR
- SENIOR DESIGN AND LANDSCAPE OFFICER
- NOTTINGHAM POLICE DESIGNING OUT CRIME
- I CRAIG 38 THE BANKS BINGHAM
- PRELIMINARY ECOLOGICAL APPRAISAL APRIL 2024
- ENVIRONMENTAL SUSTAINABILITY OFFICER
- SECRETARY OF STATE NOTIFICATION LETTER
- ENVIRONMENT AGENCY
- JAMES BATE (RBC DESIGN COMMENTS)
- NCC EDUCATION
- SPECIFICATION FOR REMEDIATION OF NATURAL TURF SPORTS SURFACES
- INDICATIVE NTP CROSS SECTION
- BUILDING PROXIMITY PLAN
- WHOLE SITE PLAN
- APPLICATIONFORMREDACTED
- BAT SURVEY REPORT NOVEMBER 2022
- BAT ROOST CHARACTERISATION AND MITIGATION REPORT OCTOBER 2024
- COMMERCIAL KITCHEN ODOUR RISK ASSESSMENT
- DESIGN CODE COMPLIANCE CHECKLIST P03
- ENERGY STATEMENT
- HISTORIC ENVIRONMENT DESK BASED ASSESSMENT
- PRELIMINARY ECOLOGICAL APPRAISAL REPORT JUNE 2022
- SECURED BY DESIGN CHECKLIST
- STRUCTURAL APPRAISAL DECEMBER 2022
- WRITTEN SCHEME OF INVESTIGATION
- NOISE IMPACT ASSESSMENT
- AGRONOMY REPORT
- ARBORICULTURAL IMPACT ASSESSMENT P01 PART 1 OF 3
- ARBORICULTURAL IMPACT ASSESSMENT P01 PART 2 OF 3
- ARBORICULTURAL IMPACT ASSESSMENT P01 PART 3 OF 3
- ARBORICULTURAL METHOD STATEMENT P01 PART 1 OF 3
- ARBORICULTURAL METHOD STATEMENT P01 PART 2 OF 3
- ARBORICULTURAL METHOD STATEMENT P01 PART 3 OF 3
- PHASE II GROUND INVESTIGATION REPORT - P02 1 OF 2
- PHASE II GROUND INVESTIGATION REPORT - P02 2 OF 2
- HERITAGE STATEMENT
- EXISTING ELEVATIONS
- EXISTING FLOOR PLANS EFAK
- EXISTING FLOOR PLANS EFAH AND EFAI AND ANC1
- EXISTING FLOOR PLANS EFAF
- EXISTING FLOOR PLANS EFAC AND EFAE AND EFAG
- EXISTING FLOOR PLANS EFAB AND EFAD
- EXISTING FLOOR PLANS EFAA
- HEALTH IMPACT ASSESSMENT
- HISTORIC BUILDING RECORDING - 27-05-26 PART 1 OF 4
- HISTORIC BUILDING RECORDING - 27-05-26 PART 2 OF 4
- HISTORIC BUILDING RECORDING - 27-05-26 PART 3 OF 4
- HISTORIC BUILDING RECORDING - 27-05-26 PART 4 OF 4
- PHASE 1 GEO-ENVIRONMENTAL DESK STUDY REPORT PART 1 OF 3
- PHASE 1 GEO-ENVIRONMENTAL DESK STUDY REPORT PART 2 OF 3
- PHASE 1 GEO-ENVIRONMENTAL DESK STUDY REPORT PART 3 OF 3
- PHASE II INSTRUSIVE GEO-ENVIRONMENTAL REPORT
- STATEMENT OF COMMUNITY INVOLVEMENT
- STUDENT SCI ADDENDUM
- SOLAR PV GLINT AND GLARE REPORT 1
- DESIGN AND ACCESS STATEMENT P06 PART 1 OF 2
- DESIGN AND ACCESS STATEMENT P06 PART 2 OF 2
- ECOLOGICAL IMPACT ASSESSMENT PART 1 OF 2
- ECOLOGICAL IMPACT ASSESSMENT PART 2 OF 2
- BIODIVERSITY IMPACT ASSESSMENT (P02)
- CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY 1 OF 7
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY 2 OF 7
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY 3 OF 7
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY 4 OF 7
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY 5 OF 7
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY 6 OF 7
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY 7 OF 7
- GA FLOOR PLAN L00
- GA FLOOR PLAN L01
- GA FLOOR PLAN L02
- GA ROOF PLAN
- GA SECTION AA BB CC DD
- GA ELEVATIONS
- GA FLOOR PLAN L00 PART A
- GA FLOOR PLAN L00 PART B
- GA FLOOR PLAN L01 PART A
- GA FLOOR PLAN L01 PART B
- GA FLOOR PLAN L02 PART A
- GA FLOOR PLAN L02 PART B
- GA FLOOR PLAN ROOF PART A
- GA FLOOR PLAN ROOF PART B
- GA SECTION AA BB CC DD EE
- GA ELEVATIONS SHEET 1
- GA ELEVATIONS SHEET 2
- EXISTING SITE PLAN P03
- SITE LOCATION PLAN
- TREE REMOVAL PROTECTION AND RETENTION PLAN
- SITE LANDSCAPING PLAN OVERVIEW
- ACCESS AND SECURITY FENCING OVERVIEW
- ACCESS AND SECURITY CIRCULATION OVERVIEW
- PLANTING STRATEGY
- SITE DEMOLITION PLAN
- LANDSCAPE MANAGEMENT AND MAINTENANCE PLAN P01
- FRA APP A TOPOGRAPHICAL AND UTILITY SURVEY
- FRA APP B PUBLIC SEWER RECORDS
- FRA APP C DRAINAGE CCTV
- FRA APP C DRAINAGE CCTV
- FRA APP C DRAINAGE CCTV
- FRA APP C DRAINAGE CCTV
- FRA APP E LLFA CORRESPONDENCE
- FRA APP F HYDRAULIC CALCULATIONS
- FRA APP G FLOOD EXCEEDANCE ROUTE PLAN
- FRA APP G SURFACE WATER DRAINAGE LAYOUT
- FRA APP G SURFACE WATER CATCHMENT PLAN
- FRA APP H SPORTS PITCH DRAINAGE LAYOUT
- FRA APP I FOUL WATER DRAINAGE LAYOUT
- FRA APP J STW CORRESPONDENCE
- SITE SECTIONS 1 OF 3
- SITE SECTIONS 2 OF 3
- SITE SECTIONS 3 OF 3
- PROW STATEMENT APP 4 SECTIONS
- PROW STATEMENT APP 3 DIVERSION PLAN
- PROW DETAILED LANDSCAPING PLAN
- PROW DIVERSION SCOPE OF WORKS
- COMMUNITY USE SCHEDULE AND SPORTS CONTINUITY PLAN
- EXTERNAL LIGHTING LAYOUT
- PLANNING STATEMENT
- BIODIVERSITY METRIC
- PROW STATEMENT
- SCHOOL TRAVEL PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsChecking the current position
The published feed does not show a live status for this application; the register on Rushcliffe's own portal holds the authoritative version.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Toot Hill Comprehensive School The Banks Bingham Nottinghamshire NG13 8BL
Request for an Environmental Impact Assessment Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 pertains to the forthcoming full planning application for the redevelopment of Toot Hill School.
Decided Outline 4 docs -
Toothill Secondary School The Banks Bingham Nottinghamshire NG13 8BL
Replacement of existing external lighting to the sports facility and athletics ground with new energy-efficient LED luminaires, including the removal of redundant fittings, bases, columns and installation of upgraded fixtures in the same and/or similar locations. Works include associated electrical upgrades and minor adjustments to mounting positions where required. The development does not involve any change of use
Decided Full applications 11 docs -
21 Fisher Lane Bingham Nottinghamshire NG13 8BQ
Erection of conservatory
Granted Full applications Extension 11 docs -
29 Tithby Road Bingham Nottinghamshire NG13 8GP
Erection of single storey extension to existing summerhouse
Granted Full applications Extension 5 docsSmall domestic -
The Stables At Long Acre House 17 Fisher Lane Bingham Nottinghamshire NG13 8BQ
Retrospective works to the building and proposed change of use from annexe to a separate dwelling
Decided Full applications 15 docsDomestic -
50 The Banks Bingham Nottinghamshire NG13 8BT
Single storey rear extension; Erection sliding gates to front; Infill roof extension; Associated landscaping and access works including patio to the front raised amphitheatre seating to the rear, gabion wall to the rear, new driveway, and ramped path to rear
Granted Full applications Extension 8 docsSmall domestic
Other full applications
In Rushcliffe
-
26/00945/FUL Decided
5 The Brambles Main Road Barnstone Nottinghamshire NG13 9JU
Single Storey Rear Extension, replacement of ground floor window with aluminium framed patio doors/windows
-
26/01378/FUL Decided
7 Church Street Bingham Nottinghamshire NG13 8AL
Repair and rebuilding of garden boundary wall, fronting highway
-
26/01396/FUL Decided
92 Grantham Road Radcliffe On Trent Nottinghamshire NG12 2HY
Construction of new detached dwelling with associated hard and soft landscaping and air source heat pump
-
26/01352/FUL Decided
85 Daleside Cotgrave Nottinghamshire NG12 3QN
New side extension above existing garage.
-
26/01732/FUL Awaiting decision
19 Oak Tree Avenue Radcliffe On Trent Nottinghamshire NG12 1AD
Single storey rear and side extension. Windows to first floor side elevation. Alteration to fenestration. Roof lights to side main roof. New Cladding to front elevation.