Skip to content
PlanIndex Get alerts
Menu

Planning application

Land South Of 25 Chapel Street Orston Nottinghamshire

Granted Rushcliffe 24/00916/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of Dwelling with associated car parking and landscaping works

As published by the council, reference 24/00916/FUL

Application record

Reference
24/00916/FUL
Type
Full Application
Status
Conditions
Decision
Application Permitted (conditional)
Received
28 May 2024
Validated
25 Jun 2024
Decided
13 Dec 2024
Ward
Cranmer
Parish
Orston
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 28 May 2024

    Received by Rushcliffe

  2. 25 Jun 2024

    Validated

    Checked as complete and ready for consideration.

  3. 13 Dec 2024

    Decision issued: Application Permitted (conditional)

  4. 31 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

34 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land South Of 25 Chapel Street Orston Nottinghamshire

    25/01399/DISCON Submitted 6 Aug 2025 0m away

    89% historically approved · decision due ~2 Oct

    Discharge of conditions 3 (Materials), 4 (Fenestration), 5 (Boundary Treatments), 6 (Landscaping), 8 (Water Efficiency), 11 (Ecological Enhancements), 12 (Road Surface), 13 (EVCP), 20 (Watercourse) from Planning Permission 25/00297/VAR

    Status unknown Conditions Windows or glazing 21 docs
  • Orston Methodist Church Chapel Street Orston Nottinghamshire NG13 9NL

    24/00247/DISCON Submitted 12 Feb 2024 30m away

    Disharge of Condition 3 (External Materials) from planning application 23/01861/FUL.

    Decided Conditions 5 docs
  • Yew Tree Farm Lombard Street Orston Nottinghamshire NG13 9NG

    20/00708/OUT Submitted 24 Mar 2020 59m away

    Outline application for the demolition of agricultural storage building and residential development with associated access arrangements (all matters reserved except for access)

    Refused Outline New dwelling Demolition 48 docs
  • 2 Chapel Garth Orston Nottinghamshire NG13 9NY

    26/00741/NMA Submitted 27 Apr 2026 84m away

    Non material amendment for 26/00271/FUL to remove single access door and replace with patio door

    Decided Amendments 6 docs
  • Land At Yew Tree Farm Lombard Street Orston Nottinghamshire

    20/00234/DISCON Submitted 31 Jan 2020 96m away

    Discharge of Condition 3 (Landscape plan showing replacement tree) from Planning Permission 19/02547/FUL

    Decided Conditions Trees 4 docs
  • Vale Cottage Lombard Street Orston Nottinghamshire NG13 9NG

    26/00802/FUL Submitted 8 May 2026 104m away

    Alterations and extension to existing dwelling, including raising height of existing ridge and eaves and new brick skin cladding to front elevation, and installation of solar panels

    Refused Full applications Extension 13 docs
    Domestic

In Rushcliffe

  • 26/01458/FUL Awaiting decision

    38 Kingswood Road West Bridgford Nottinghamshire NG2 7HS

    Single storey rear extension

    27 Aug 2026 Full applications
  • 26/01457/FUL Awaiting decision

    1 Shadwell Grove Radcliffe On Trent Nottinghamshire NG12 2ET

    Demolition of conservatory, Proposed single storey side extension.

    27 Aug 2026 Full applications
  • 26/01449/FUL Awaiting decision

    13-23 Willow Road West Bridgford Nottinghamshire NG2 7AY

    To replace the existing front entrance door with a new steel front entrance door.

    26 Aug 2026 Full applications
  • 26/01453/FUL Awaiting decision

    2-12 Grainger Avenue West Bridgford Nottinghamshire NG2 7AS

    To replace the existing front entrance door with a new steel front entrance door.

    26 Aug 2026 Full applications
  • 26/00173/FUL Granted

    1 The Nook East Leake Nottinghamshire LE12 6LF

    Erect detached single-storey garden room

    28 Jan 2026 Full applications