Planning application

48 Main Street East Leake Nottinghamshire LE12 6PG

Granted Rushcliffe 23/02182/FUL Full Application

Works: New dwelling Extension Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed Demolition of Part of Existing Barns; Conversion of Existing Barns and Rebuild New Barn with a Single Storey Extension to form 1 New Dwelling

As published by the council, reference 23/02182/FUL

Application record

Reference
23/02182/FUL
Type
Full Application
Status
Conditions
Decision
Application Permitted (conditional)
Received
29 Nov 2023
Validated
30 Nov 2023
Decided
11 Oct 2024
Ward
Leake
Parish
East Leake
Decision by
Committee Decision
Postcode
LE12 6PG

Timeline

Dates from the published record

  1. 29 Nov 2023

    Received by Rushcliffe

  2. 30 Nov 2023

    Validated

    Checked as complete and ready for consideration.

  3. 11 Oct 2024

    Decision issued: Application Permitted (conditional)

  4. 17 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

49 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 48 Main Street East Leake Nottinghamshire LE12 6PG

    24/00211/RELDEM Submitted 30 Nov 2023 0m away

    Proposed Demolition of Part of Existing Barns; Conversion of Existing Barns and Rebuild New Barn with a Single Storey Extension to form 1 New Dwelling

    Granted Other New dwelling Extension +1 27 docs
    Domestic
  • 48 Main Street East Leake Nottinghamshire LE12 6PG

    26/00591/DISCON Submitted 31 Mar 2026 0m away

    Discharge of Conditions 3 (Materials), 4 (Landscaping), 5 (Tree Protection Plan), 6 (Building Record Exercise), 7 (Biodiversity) and 8 (Demolition) of planning permission 23/02182/FUL

    Decided Conditions Demolition Trees 18 docs
  • 48 Main Street East Leake Nottinghamshire LE12 6PG

    26/00600/DISCON Submitted 31 Mar 2026 0m away

    Discharge of Conditions 3 (Hand tools) , 4 (Tree Protection) and 5 (Building Recording Exercise) of planning permission 24/00211/RELDEM

    Decided Conditions Trees 14 docs
  • 48 Main Street East Leake Nottinghamshire LE12 6PG

    20/01988/RELDEM Submitted 17 Aug 2020 22m away

    Demolition of existing rear garage outbuilding

    Granted Other Demolition 21 docs
  • 42 Main Street East Leake Nottinghamshire LE12 6PG

    23/00186/FUL Submitted 2 Feb 2023 39m away

    Change of use of residential ground floor flat (C3) to two units within Use Class E (a) (Shop) E(b) (Food and Drink) or E (c) (Financial and Professional Services); alterations to external elevations including new shop frontage, first floor window to side elevation, installation of air conditioning units, external lighting and two storey rear extension. Part retrospective

    Granted Full applications Extension Windows or glazing 32 docs
    Several homes
  • 73A Main Street East Leake Nottinghamshire LE12 6PF

    24/01599/ADV Submitted 18 Sep 2024 51m away

    Shop front signage

    Granted Advertising Windows or glazing 18 docs

In Rushcliffe

  • 26/01458/FUL Awaiting decision

    38 Kingswood Road West Bridgford Nottinghamshire NG2 7HS

    Single storey rear extension

    27 Aug 2026 Full applications
  • 26/01457/FUL Awaiting decision

    1 Shadwell Grove Radcliffe On Trent Nottinghamshire NG12 2ET

    Demolition of conservatory, Proposed single storey side extension.

    27 Aug 2026 Full applications
  • 26/00173/FUL Granted

    1 The Nook East Leake Nottinghamshire LE12 6LF

    Erect detached single-storey garden room

    28 Jan 2026 Full applications
  • 26/01440/FUL Awaiting decision

    4 Carlton Crescent East Leake Nottinghamshire LE12 6JF

    Double storey side extension and demolition of existing rear garage

    25 Aug 2026 Full applications
  • 26/01448/FUL Awaiting decision

    43 Lingford Cotgrave Nottinghamshire NG12 3LB

    Erection of 2.23 metres high boundary fence adjacent highway. Associated garden levelling and ground retention using gravel boards(Retrospective)

    25 Aug 2026 Full applications