Planning application

33 Ropewalk East Leake Nottinghamshire LE12 6NR

Granted Rushcliffe 20/03284/FUL Full Application

Works: Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of two-storey link extension, erection of single storey rear infill extension, addition front gable and porch to main dwelling. Application of cladding Erection of first floor extension to garage including raising of roof. Construction front and rear dormer/gable windows to garage.

As published by the council, reference 20/03284/FUL

Application record

Reference
20/03284/FUL
Type
Full Application
Status
Conditions
Decision
Application Permitted (conditional)
Received
25 Dec 2020
Validated
14 Jan 2021
Decided
25 May 2021
Ward
Leake
Parish
East Leake
Decision by
Delegated Decision
Postcode
LE12 6NR

Timeline

Dates from the published record

  1. 25 Dec 2020

    Received by Rushcliffe

  2. 14 Jan 2021

    Validated

    Checked as complete and ready for consideration.

  3. 25 May 2021

    Decision issued: Application Permitted (conditional)

  4. 17 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

39 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Rushcliffe

  • 26/01458/FUL Awaiting decision

    38 Kingswood Road West Bridgford Nottinghamshire NG2 7HS

    Single storey rear extension

    27 Aug 2026 Full applications
  • 26/01457/FUL Awaiting decision

    1 Shadwell Grove Radcliffe On Trent Nottinghamshire NG12 2ET

    Demolition of conservatory, Proposed single storey side extension.

    27 Aug 2026 Full applications
  • 26/00173/FUL Granted

    1 The Nook East Leake Nottinghamshire LE12 6LF

    Erect detached single-storey garden room

    28 Jan 2026 Full applications
  • 26/01440/FUL Awaiting decision

    4 Carlton Crescent East Leake Nottinghamshire LE12 6JF

    Double storey side extension and demolition of existing rear garage

    25 Aug 2026 Full applications
  • 26/01448/FUL Awaiting decision

    43 Lingford Cotgrave Nottinghamshire NG12 3LB

    Erection of 2.23 metres high boundary fence adjacent highway. Associated garden levelling and ground retention using gravel boards(Retrospective)

    25 Aug 2026 Full applications