Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Longcross South Longcross Road Chertsey Surrey KT16 0DS

Granted Runnymede RU.26/0757

Works: Trees

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

T04 False acacia (Robinia pseudoacacia) Fell tree. Timescale: 31-Aug-2026 (3 Months)" T013 Pedunculate oak (Quercus robur) Fell tree to 1m stump to prevent trip hazard. Timescale: 31-Aug-2026 (3 Months) T020 Common beech (Fagus sylvatica) Fell to 6m monolith to retain habitat value Timescale: 31-Aug-2026 (3 Months)" T027 Sweet chestnut (Castanea sativa) Fell dead stem (see photos) Timescale: 31-Aug-2026 (3 Months)" T031 "Silver birch (Betula pendula)" Fell tree. Timescale: 31-Aug-2026 (3 Months)"

As published by the council, reference RU.26/0757

Application record

Reference
RU.26/0757
Status
Granted As published: FINAL DECISION
Decision
Granted As published: Tree- Grant works to tree covered by TPO
Postcode
KT16 0DS

Site history

Applications at this address on the Runnymede register

This site has had 2 applications: 1 approved, 0 refused.

  • RU.26/1289 Awaiting decision

    Land At Longcross South Longcross Road Chertsey Surrey KT16 0DS

    Erection of an electrical substation at Longcross South and cable route to connect to Longcross North electrical substation, and associated access.

Timeline

Dates from the published record

  1. 30 Jul 2026

    Added to PlanIndex

What this grant of permission means

Runnymede granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Runnymede's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Land At Longcross South Longcross Road Chertsey Surrey KT16 0DS

    RU.26/1289 50 yards away

    81% historically approved

    Erection of an electrical substation at Longcross South and cable route to connect to Longcross North electrical substation, and associated access.

    Awaiting decision
  • Land At Longcross South Longcross Road Chertsey Surrey KT16 0DS

    26/0934/PCA Submitted 7 Oct 2026 50 yards away

    89% historically approved · decision due ~2 Dec

    Consultation from Runneymede Borough Council in respect of application no. RU.26/1289 for Erection of an electrical substation at Longcross South and cable route to connect to Longcross North electrical substation, and associated access.

    Awaiting decision
  • Longcross South Studios Ltd, Barrowhills, Longcross, Chertsey KT16 0DS

    RU.25/1671 Submitted 21 Nov 2025 50 yards away

    5 day notification of works to a TPO

    Decided Trees 95 docs
  • Barrowhills Longcross Road Chertsey Surrey KT16 0DS

    RU.23/1019 Submitted 2 Aug 2023 50 yards away

    Advertisement Consent for the installation of 2 non-illuminated entrance signs fixed to existing boundary fence at the Barrowhills entrance

    Granted Advertising 11 docs
    Small domestic
  • Barrowhills Longcross Road Chertsey Surrey KT16 0DS

    RU.23/0795 Submitted 13 Jun 2023 50 yards away

    Variation of Condition 2 (Temporary Permission) of planning approval RU.21/1806 (Proposed siting of temporary structures and the use of land for filming including: 2 no. temporary structures on existing car park and 1 no. temporary structure on former tennis court, erection of 1 no. marquee and retention of existing marquee and siting of 9no. attached portacabin units together with temporary surfacing for car parking and associated temporary internal access) to extend the temporary permission by up to 3 years.

    Granted Conditions 12 docs
  • South Site Former DERA Site Chobham Lane Longcross Chertsey

    23/30008/SMI Submitted 23 May 2023 350 yards away

    Temporary planning permission for the use of the land for film studio purposes including the erection of studio stages and workshops, erection of cabins and marquees within dedicated zones, and the use of the land for associated filming purposes and as studio backlot (part retrospective)

    Refused 6 docs