Planning application
30 Woodham Lane Addlestone Surrey KT15 3NA
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Retrospective application for a single storey rear infill extension.
As published by the council, reference RU.25/1654
Application record
- Reference
- RU.25/1654
- Type
- Amendment
- Status
- FINAL DECISION
- Decision
- Grant Consent - subject to conditions
- Received
- 28 Nov 2025
- Validated
- 28 Nov 2025
- Decided
- 12 Jan 2026
- Postcode
- KT15 3NA
Timeline
Dates from the published record
-
28 Nov 2025
Received by Runnymede
-
12 Jan 2026
Decision issued: Grant Consent - subject to conditions
-
11 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About amendments applications
How this application type works
An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.
Nearby applications
Within 500 metres
-
10 Woodham Lane Addlestone Surrey KT15 3NA
Advertisement Consent for 2 no. advertising signs.
Granted Advertising 12 docs -
10 Woodham Lane Addlestone Surrey KT15 3NA
Change of Shop Front, Externally Mounted Shutter, Awning, Advertising Signs and Dropped Kerb
Refused Advertising Windows or glazing 12 docs -
38 Woodham Lane New Haw Addlestone Surrey KT15 3NA
Change of use to include MOT testing within the workshop to the rear of the site, including the addition of an MOT inspection pit.
Refused Amendments -
30 Woodham Lane Addlestone Surrey KT15 3NA
Certificate of Proposed Lawful Development for single storey rear infill extension.
Withdrawn Outline Extension 10 docsSmall domestic -
-
14 Common Lane New Haw Surrey KT15 3LH
First floor rear extension and all associated works
Granted Extension 14 docs
Other amendments applications
In Runnymede
-
RU.26/0531 Granted
Dunford House Guildford Road Chertsey Surrey KT16 0QW
Certificate of Existing Lawful Development for three existing outbuildings and an existing pool house.
-
RU.26/0539 Granted
2 Longbourne Way Chertsey Surrey KT16 9EB
Amendments to front porch, changes to fenestration, alteration of front boundary treatment, construction of storage for bins, and air source heat pump.
-
RU.26/0441 Granted
12 Shakespeare Road Addlestone Surrey KT15 2ST
Change of use of the detached garage for the storage of private motor vehicles and domestic storage not associated with no. 12 Shakespeare Road.
-
RU.26/0596 Refused
5 Cavendish House The Avenue Surrey Egham TW20 9AB
Prior approval application for change of use from Commercial, Business and Service (Use Class E) to create 4 residential units (Use Class C3) under the Town and Country Planning (General Permitted Development) (England) Order 2015 as amended Schedule 2, Part 3, Class MA.
-
RU.25/1788 Granted
The George Chertsey Road Addlestone Surrey KT15 2EA
Full Planning for the change of use from public house ( Class A4) to create 1 residential dwelling(Class C3) following the demolition of the side and rear projections of the existing building, erection of a security access gate and pv panels.