Skip to content
PlanIndex Get alerts
Menu

Planning application

Ash Cottage Blacksmiths Lane Chertsey Surrey KT16 8AD

Granted Runnymede RU.25/1168

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Repairs and replacement of defective roofs using materials to match existing (amended plans and revision of works received)

As published by the council, reference RU.25/1168

Application record

Reference
RU.25/1168
Status
FINAL DECISION
Decision
Grant Consent - subject to conditions
Received
10 Sep 2025
Validated
10 Sep 2025
Decided
23 Dec 2025
Postcode
KT16 8AD

Site history

Applications at this address on the Runnymede register

This site has had 3 applications since 2024: 2 approved, 1 refused.

  • RU.26/0065 Granted

    Ash Cottage Blacksmiths Lane Chertsey Surrey KT16 8AD

    Details pursuant to Discharge Condition 3 (External materials) and 4 (re-roofing method statement) of planning permission RU.25/1168 Repairs and replacement of defective roofs using materials to match existing (amended plans and revision of works received).

    Decided 17 Feb 2026 Conditions
  • RU.24/1495 Refused

    Ash Cottage Blacksmiths Lane Chertsey Surrey KT16 8AD

    Certificate of Proposed Lawful Development to replace existing roof.

    Decided 25 Nov 2024 Amendments

Timeline

Dates from the published record

  1. 10 Sep 2025

    Received by Runnymede

  2. 23 Dec 2025

    Decision issued: Grant Consent - subject to conditions

  3. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Runnymede granted permission on 23 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Runnymede's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Ash Cottage Blacksmiths Lane Chertsey Surrey KT16 8AD

    RU.24/1495 Submitted 15 Nov 2024 0m away

    Certificate of Proposed Lawful Development to replace existing roof.

    Refused Amendments 4 docs
  • Ash Cottage Blacksmiths Lane Chertsey Surrey KT16 8AD

    RU.26/0065 Submitted 23 Jan 2026 0m away

    Details pursuant to Discharge Condition 3 (External materials) and 4 (re-roofing method statement) of planning permission RU.25/1168 Repairs and replacement of defective roofs using materials to match existing (amended plans and revision of works received).

    Granted Conditions 5 docs
  • 23 Drill Hall Road Chertsey Surrey KT16 8EN

    RU.25/1467 Submitted 21 Nov 2025 74m away

    Double storey side extension.

    Refused Extension 21 docs
  • 23 Drill Hall Road Chertsey Surrey KT16 8EN

    RU.25/1476 Submitted 21 Nov 2025 74m away

    Increase in fence height to 2 metres.

    Granted 6 docs
    Small domestic
  • 23 Drill Hall Road Chertsey Surrey KT16 8EN

    RU.26/0894 76m away

    Certificate of Proposed Lawful Development for a single-storey side extension and loft conversion with rear dormer roof extension.

    Refused Extension Loft or dormer
    Small domestic
  • 23 Drill Hall Road Chertsey Surrey KT16 8EN

    RU.26/0791 76m away

    80% historically approved

    The application relates to the protected trees located within the front and side boundaries of 23 Drill Hall Road, Chertsey. No direct works to the protected trees are proposed. Consent is sought for the construction of a proposed driveway and future residential extension works within the vicinity of the protected trees. All works will be undertaken in accordance with the submitted Arboricultural Method Statement (AMS) and Tree Protection Plan (TPP), which detail the proposed tree protection measures, no-dig construction methodology, piled foundation solution and site management procedures to safeguard the retained trees throughout the construction process.

    Awaiting decision Extension Trees