Proposal
Erection of a detached garage with pitched roof.
As published by the council, reference RU.24/1519
Timeline
Dates from the published record
-
23 Apr 2025
Received by Runnymede
-
30 Jun 2025
Decision issued: Grant Consent - subject to conditions
-
3 Aug 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Runnymede is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
RU.23/0320 Granted
Addlestone Car Park A318 New Haw Road Addlestone Surrey KT15 1PX
T1 Horse Chestnut - Fell
-
RU.26/0855 Awaiting decision
1 A Liberty Lane Addlestone Surrey KT15 1LU
T1 - Lawson Cypress - fell to ground level - the root system has extended beyond the property boundary and is causing significant uplift to the public footway adjacent to the property. This presents a potential trip hazard to pedestrians and has the potential to expose the property owner and highway authority to ongoing maintenance and liability issues. Due to the species, size and proximity of the tree to the highway, the root growth is expected to continue, resulting in further damage. Pruning the roots is unlikely to provide a sustainable solution and may compromise the structural stability and health of the tree. Felling the tree is therefore considered the most appropriate long-term solution to prevent further damage to the public highway and eliminate the risk to public safety. Replanting in this location would be inappropriate due to the reasons above.
-
RU.26/0686 Granted
21 Liberty Lane Addlestone KT15 1LU
Variation of Condition 2 (approved plans) and Condition 3 (External materials) of application RU.24/0698 for a single story rear extention following demolition of existing extension. For a change to external materials and reconfigured window and door.
-
RU.21/0859 Granted
38 Crockford Park Road Addlestone KT15 2LX
Variation to condition 2 of Planning permission RU.20/1043 (to add 0.8 metre high railings on top of existing 1.2 metre high wall with a vehicle access gate and pedestrian gate) to reduce the exisitng wall by 600mm and adding 1200mm brick posts at 2000mm centres with railings of 2000m between. (amended description 02/08/2021)
-
RU.26/0288 Refused
77 Brighton Road Addlestone Surrey KT15 1PG
Enlargement and raising of the roof to include a rear Juliette dormer balcony and 3no front roof lights.
-
RU.23/0190 Granted
26 Brighton Road Addlestone Surrey KT15 1PR
Dormer to side roof slope