Skip to content
PlanIndex Get alerts
Menu

Planning application

33 and 35 Bramley Close Chertsey KT16 8HJ

Granted Runnymede RU.24/1358 Full

Works: Extension Loft or dormer Roofing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Joint Planning application for extensions and alterations to the main roof with an increase in ridge height and rear dormers with roof lights to create habitable rooms. Part pitched roof over the existing single storey flat roof rear extension and single storey rear extension (Amended description)

As published by the council, reference RU.24/1358

Application record

Reference
RU.24/1358
Type
Full
Status
FINAL DECISION
Decision
Grant Consent - subject to conditions
Received
11 Oct 2024
Validated
11 Oct 2024
Decided
3 Dec 2024
Postcode
KT16 8HJ

Timeline

Dates from the published record

  1. 11 Oct 2024

    Received by Runnymede

  2. 3 Dec 2024

    Decision issued: Grant Consent - subject to conditions

  3. 21 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2 Bramley Close Chertsey Surrey KT16 8HJ

    RU.24/0399 Submitted 5 Apr 2024 0m away

    Single storey rear extension following part removal of existing extension

    Granted Extension 12 docs
    Small domestic
  • 32 Bramley Close Chertsey Surrey KT16 8HJ

    RU.19/1643 Submitted 18 Nov 2019 0m away

    A single storey rear extension with a depth of 4.71 metres beyond the rear wall of the original dwelling house with a maximum height of 2.74 metres and eaves height of 2.74 metre

    Granted Extension 7 docs
    Small domestic
  • 4 Bramley Close Chertsey Surrey KT16 8HJ

    RU.26/0599 1m away

    Single storey rear extension with flat roof over facilitating internal alterations, following demolition/reconfiguration of existing rear portions.

    Granted Extension Demolition
    Small domestic
  • 90 Fordwater Road Chertsey Surrey KT16 8HQ

    RU.26/0519 Submitted 28 Apr 2026 107m away

    Single storey rear extension

    Granted Extension 11 docs
    Small domestic
  • 92 Fordwater Road Chertsey Surrey KT16 8HQ

    RU.26/0208 Submitted 9 Mar 2026 107m away

    Single storey side and rear extension (wrap around).

    Granted Extension 16 docs
    Small domestic
  • 149 Eastworth Road Chertsey Surrey KT16 8DU

    RU.26/1154 107m away

    80% historically approved

    Proposed single storey rear, side and front porch extension.

    Awaiting decision Extension
    Small domestic

In Runnymede

  • RU.26/0118 Granted

    Fairmont Windsor Park Bishopsgate Road Englefield Green Surrey TW20 0YL

    Application for the full retention of the existing stable block at Fairmont Windsor Park and demolition of the stable block on land adjacent to 9 Prospect Lane.

    29 Apr 2026 Full applications
  • RU.26/0451 Granted

    Manorcroft Nursery School Manorcrofts Road Egham Surrey TW20 9LX

    1. Norway Maple - Remove major deadwood greater than 20mm in diameter, crown thin by 10% and reduce the lower canopy by up to 1 metre. All pruning cuts shall be made to suitable secondary growth points and shall maintain a stable platform for the expected regrowth 18x13m down to 18x12m works to allow light in to play area beneath and remove danger of deadwood falling

    2 Apr 2026 Full applications
  • RU.26/0280 Granted

    The American School In Switzerland Coldharbour Lane Thorpe Surrey TW20 8TE

    Full Planning Permission to reinstate first floor windows to their original design.

    9 Mar 2026 Full applications
  • RU.25/1206 Refused

    83 London Street Chertsey Surrey KT16 8AN

    Full Planning for the partial demolition of rear stores/WC and construction of a single storey rear extension, internal alterations and repair of rear first floor brickwork/external paint.

    10 Sep 2025 Full applications
  • RU.25/1256 Granted

    Tulk House Ottershaw Park Ottershaw Surrey KT16 0QG

    T12 - Mixed group - including large Oak - cut back overhanging branches to clear parking area to avoid damage to cars G63 - W6 Ash within woodland group - Fell to leave 4m standing pole - dying from Ash die-back G63 - W10, W11 and W12 Ash within woodland group - Fell to ground level - dead and dying from Ash die-back T64 - Oak - Raise canopy up to 5m over road and garage to allow clearance for vehicles T65 - Oak - Raise canopy up to 5m over road and garage to allow clearance for vehicles

    23 Sep 2025 Full applications