Skip to content
PlanIndex Get alerts
Menu

Planning application

. Courtesy Consultation . 9999

Awaiting decision Rotherham RB2025/1329 Outline

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Courtesy consultation to enhance the electricity network by building and operating a new 60 kilometre (km), 400 kilovolt (kV) overhead electricity line.

As published by the council, reference RB2025/1329

Application record

Reference
RB2025/1329
Type
Outline
Status
Valid
Received
6 Oct 2025
Validated
6 Oct 2025
Parish
Non-Parished
Decision by
Proposed to be Delegated

Site history

Applications at this address on the Rotherham register

This site has had 51 applications since 2015: 31 approved, 0 refused.

  • RB2026/0701 Granted

    . Courtesy Consultation . 9999

    Courtesy Consultation to Erect A Foodstore, Drive-thru Units, a Petrol Filling Station with Associated Shop and EV Parking Hub, and a Padel Facility along with all Associated Works Including Access, Parking and Landscaping at land adj A57 North Of Shireoaks Common Shireoaks Nottinghamshire

    Decided 28 May 2026 Outline
  • RB2026/0221 Decided

    . Courtesy Consultation . 9999

    Courtesy Consultation for Carlton in Lindrick Neighbourhood Plan

    Decided 3 Mar 2026 Outline
  • RB2026/0109 Granted

    . Courtesy Consultation . 9999

    Courtesy Consultation for New leisure resort (sui generis) incorporating Water Park, adventure park, hotel, conferencing facilities, restaurants and staff accommodation with associated access, parking and landscaping at Land South Of Springfield Farm At The Corner Of Gapsick Lane And Worksop Road Whitwell Common

    Decided 24 Feb 2026 Outline
  • RB2026/0051 Awaiting decision

    . Courtesy Consultation . 9999

    Courtesy Consultation for Proposed Peak Cluster CCS Pipeline

    Submitted 14 Jan 2026 Outline
  • RB2025/1008 Granted

    . Courtesy consultation . 9999

    Courtesy consultation for an Outline Planning Application for up to 1,120 New Market and Affordable Homes, Specialist Residential Accommodation, up to 6.5ha of Land for Employment Use, up to 2.5ha of Land for Education Use, Local Retail, Community Uses, Open Spaces, Leisure and Sport Uses, Woodland Planting, Formal and Informal Open Space, Ecological Areas, Accesses, Cycle and Pedestrian Routes, Supporting Infrastructure, Sustainable Urban Drainage Systems, Ground Remodelling and Landscaping Works. All Matters Reserved apart from Access from the A60 ( to Include Link Road Section from A60 through Hill Wood) and B6045 land At Peaks Hill Farm Off Carlton Road Worksop Nottinghamshire

    Decided 13 Feb 2026 Outline
  • RB2025/0812 Granted

    . Courtesy Consultation . 9999

    Courtesy consultation for proposed residential development with public open space, access, landscaping and associated infrastructure at Land South East Of Old Road Conisbrough Doncaster

    Decided 1 Jul 2025 Outline
  • RB2025/0688 Awaiting decision

    . Courtesy Consultation . 9999

    Courtesy Consultation for Steeple Renewable Energy Storage

    Submitted 19 May 2025 Outline
  • RB2025/0444 Decided

    . Courtesy Consultation . 9999

    Courtesy Consultation for Tween Bridge Solar Farm

    Decided 28 Mar 2025 Outline
  • RB2025/0084 Granted

    . Courtesy Consultation . 9999

    Courtesy consultation for a development consent order (“DCO”) for the proposed Steeple Renewables Project

    Decided 3 Mar 2025 Outline
  • RB2025/0081 Decided

    . Courtesy Consultation . 9999

    Courtesy Consultation for the Commercial Development (Class E) to Include new food store, two drive thrus and petrol filling station with Electric Vehicle Charging Hub and ancillary retail shop

    Decided 2 Oct 2025 Outline

Timeline

Dates from the published record

  1. 6 Oct 2025

    Received by Rotherham

  2. 22 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 1 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Rotherham took a median of 52 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Rotherham for determination, against a statutory target of eight weeks. Over the last year Rotherham decided outline applications in a median of 36 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Rotherham

  • RB2026/0947 Granted

    5 Cawthorne Close East Herringthorpe

    Prior Notification for a larger house extension with a 4.30m rear extension, a height of 3.00m to the eaves and an overall height of 3.30m

    6 Jul 2026 Outline
  • RB2025/1193 Refused

    Land adjacent 24 Flash Lane Bramley 0024

    Outline application for the erection of up to 3no. residential dwellings with all matters reserved

    4 Sep 2025 Outline
  • RB2025/1138 Granted

    land rear of 190 Swinston Hill Road Dinnington 9999

    Reserved matters application details of landscaping, scale, access, external appearance and layout for the erection of 4 dwellinghouses (reserved by outline RB2020/0479)

    22 Aug 2025 Outline
  • RB2026/0267 Granted

    Unit 1 Nobel Way Business Park Nobel Way Dinnington

    Prior Notification for the Installation of other Solar Photovoltaics (PV) equipment.

    20 Feb 2026 Outline
  • RB2025/1020 Granted

    208 Brinsworth Lane Brinsworth 0208

    Reserved matters application (details of landscaping, layout, appearance, and scale) for the demolition of garages and erection of 2 dwellinghouses (reserved by outline RB2023/1526)

    28 Jul 2025 Outline