Planning application

Woodlands Moor Lane North Ravenfield 9999

Granted Rotherham RB2025/0856 Other

Works: New dwelling Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of bungalow and erection of two storey detached dwelling with attached garage

As published by the council, reference RB2025/0856

Application record

Reference
RB2025/0856
Type
Other
Status
Dec
Decision
GRANTED CONDITIONALLY
Received
20 Jun 2025
Validated
26 Jun 2025
Decided
5 Sep 2025
Ward
Bramley & Ravenfield Ward
Parish
Ravenfield
Decision by
Proposed to be Delegated

Site history

Applications at this address on the Rotherham register

This site has had 4 applications since 2024: 4 approved, 0 refused.

  • RB2025/0020 Granted

    Woodlands Moor Lane North Ravenfield 9999

    Lawful Development Certificate for proposed erection of single storey side extension to form garage

    Decided 5 Feb 2025 Outline
  • RB2024/1482 Granted

    Woodlands Moor Lane North Ravenfield 9999

    Prior Notification for a larger house extension with a 4.50m rear extension, a height of 2.83m to the eaves and an overall height of 3m

    Decided 17 Jan 2025 Outline
  • RB2024/1462 Granted

    Woodlands Moor Lane North Ravenfield 9999

    Prior Notification for an enlargement of a dwellinghouse of an additional storey to an overall height of 8m

    Decided 31 Jan 2025 Outline

Timeline

Dates from the published record

  1. 20 Jun 2025

    Received by Rotherham

  2. 26 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 5 Sep 2025

    Decision issued: GRANTED CONDITIONALLY

  4. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Rotherham granted permission on 5 September 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Rotherham

  • RB2026/0683 Awaiting decision

    Brookdale Rose Lane Brookhouse

    Demolition of existing bungalow and detached garage and constructed of detached self-build bungalow

    12 May 2026 Other
  • RB2025/1048 Granted

    1 Farm Close Brinsworth 0001

    Demolition of existing carport & outbuilding & erection of a single storey side extension

    31 Jul 2025 Other
  • RB2025/1189 Granted

    2 Packman Road Wath-upon-Dearne 0002

    Demolition of existing takeaway and erection of building for use as a barbers shop

    2 Sep 2025 Other
  • RB2025/1250 Granted

    14 Hall Road Moorgate 0014

    Demolition of conservatory and erection of single storey rear extension, and alterations to retaining wall with changes to land levels to rear

    16 Sep 2025 Other
  • RB2025/0083 Granted

    9 Moat Lane Wickersley 0009

    Demolition of existing dwelling and erection of two storey detached dwelling with detached dormer bungalow to rear including installation of flue and alterations to existing vehicular access

    20 Jan 2025 Other