Skip to content
PlanIndex Get alerts
Menu

Planning application

71 Hall Road Moorgate 0071

Granted Rotherham RB2025/0357

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey front, two storey side & single storey rear extension

As published by the council, reference RB2025/0357

Application record

Reference
RB2025/0357
Status
Dec
Decision
GRANTED CONDITIONALLY
Received
13 Mar 2025
Validated
13 Mar 2025
Decided
24 Apr 2025
Ward
Boston Castle Ward
Decision by
Delegated (Part 2B)

Timeline

Dates from the published record

  1. 13 Mar 2025

    Received by Rotherham

  2. 24 Apr 2025

    Decision issued: GRANTED CONDITIONALLY

  3. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Rotherham is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • 10 Hall Road Moorgate 0010

    RB2024/0947 Submitted 4 Jul 2024 0m away

    Demolition of existing front and rear porches, pitched roof over existing two storey side extension, erection of a two storey & single storey rear extension with balcony at first floor and new porch to front

    Granted Other Extension Demolition 11 docs
    Small domestic
  • 10 Hall Road Moorgate 0010

    RB2023/1617 Submitted 16 Nov 2023 0m away

    Prior Notification for a larger house extension with a 8m rear extension, a height of 2.25m to the eaves and an overall height of 3.92m

    Refused Outline Extension 7 docs
  • 10 Hall Road Moorgate 0010

    RB2024/0605 Submitted 17 Apr 2024 0m away

    Prior Notification for a larger home extension with an 8m rear extension, a height of 2.25m to the eaves and an overall height of 3.43m

    Granted Outline Extension 6 docs
  • 14 Hall Road Moorgate 0014

    RB2025/1250 Submitted 16 Sep 2025 0m away

    Demolition of conservatory and erection of single storey rear extension, and alterations to retaining wall with changes to land levels to rear

    Granted Other Extension Demolition 16 docs
    Small domestic
  • 71 Hall Road Moorgate 0071

    RB2024/1031 Submitted 18 Jul 2024 0m away

    Single storey front, side & rear extension

    Granted Extension 6 docs
    Small domestic
  • Cedar Cottage Mountenoy Road Moorgate 9999

    RB2023/1212 Submitted 6 Sep 2023 117m away

    Application to undertake works to a tree(s) within Moorgate Conservation Area

    Granted Trees