Planning application

Mosque Chapel Walk Rotherham Town Centre 9999

Granted Rotherham RB2024/0870 Other

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of front and side extension, erection of 3 storey side extension, 2nd floor front and side extension and single storey rear extension including external alterations, minaret and dome on roof

As published by the council, reference RB2024/0870

Application record

Reference
RB2024/0870
Type
Other
Status
Dec
Decision
GRANTED CONDITIONALLY
Received
13 Jun 2024
Validated
5 Aug 2024
Decided
13 Nov 2024
Ward
Boston Castle Ward
Parish
Non-Parished
Decision by
Proposed to be Delegated

Site history

Applications at this address on the Rotherham register

This site has had 2 applications since 2024: 2 approved, 0 refused.

  • RB2025/0075 Granted

    Mosque Chapel Walk Rotherham Town Centre 9999

    Discharge of conditions 04 & 11 imposed by application RB2024/0870

    Decided 28 Jan 2025 Conditions

Timeline

Dates from the published record

  1. 13 Jun 2024

    Received by Rotherham

  2. 5 Aug 2024

    Validated

    Checked as complete and ready for consideration.

  3. 13 Nov 2024

    Decision issued: GRANTED CONDITIONALLY

  4. 30 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • RB2025/0075 Granted

    Mosque Chapel Walk Rotherham Town Centre 9999

    Discharge of conditions 04 & 11 imposed by application RB2024/0870

    Decided 28 Jan 2025 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Rotherham granted permission on 13 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

In Rotherham

  • RB2026/0683 Awaiting decision

    Brookdale Rose Lane Brookhouse

    Demolition of existing bungalow and detached garage and constructed of detached self-build bungalow

    12 May 2026 Other
  • RB2025/1048 Granted

    1 Farm Close Brinsworth 0001

    Demolition of existing carport & outbuilding & erection of a single storey side extension

    31 Jul 2025 Other
  • RB2025/1189 Granted

    2 Packman Road Wath-upon-Dearne 0002

    Demolition of existing takeaway and erection of building for use as a barbers shop

    2 Sep 2025 Other
  • RB2025/1250 Granted

    14 Hall Road Moorgate 0014

    Demolition of conservatory and erection of single storey rear extension, and alterations to retaining wall with changes to land levels to rear

    16 Sep 2025 Other
  • RB2025/0083 Granted

    9 Moat Lane Wickersley 0009

    Demolition of existing dwelling and erection of two storey detached dwelling with detached dormer bungalow to rear including installation of flue and alterations to existing vehicular access

    20 Jan 2025 Other